System and method for automatically determining the electrical energy
service type to which an energy meter is connected
Abstract
A system for determining the service type to which an energy meter having
meter elements is connected. The system includes a memory for storing
reference information relating to different service types. The system
determines which meter elements of the energy meter are active, and then
determines relative phase angles and phase voltages of the meter elements.
The relative phase angles are determined in to be in an ABC or a CBA
rotation. Power quality monitoring is used in determining the phase
voltages. The relative phase angles and phase voltages are compared to the
reference information to determine the service type. The reference
information includes services and scaling information, a nominal service
voltage, a programmable potential indicator threshold, and a maximum and a
minimum tolerance with respect to the nominal service voltage.
Inventors:
|
Hubbard; Vick A. (Wake Forest, NC);
Munday; Mark L. (Raleigh, NC);
Hemminger; Rodney C. (Raleigh, NC);
Holdsclaw; Scott T. (Raleigh, NC)
|
Assignee:
|
ABB Power T&D Company Inc. (Raleigh, NC)
|
Appl. No.:
|
201292 |
Filed:
|
November 30, 1998 |
Current U.S. Class: |
702/61; 702/65 |
Intern'l Class: |
G01R 021/06 |
Field of Search: |
702/57,60,61,62,64,65,79,80,81,90,189,FOR 111
324/500,74,76.11,76.77,86,110
|
References Cited
U.S. Patent Documents
4200933 | Apr., 1980 | Nickel et al. | 364/571.
|
4301508 | Nov., 1981 | Anderson et al. | 364/483.
|
4884021 | Nov., 1989 | Hammond et al. | 324/142.
|
4977515 | Dec., 1990 | Rudden et al. | 364/492.
|
4979122 | Dec., 1990 | Davis et al. | 364/483.
|
5059896 | Oct., 1991 | Germer et al. | 324/142.
|
5302890 | Apr., 1994 | McEachern et al. | 324/142.
|
5315235 | May., 1994 | Atherton et al. | 324/116.
|
5391983 | Feb., 1995 | Lusignan | 342/142.
|
5469049 | Nov., 1995 | Briese et al. | 324/76.
|
5471137 | Nov., 1995 | Briese et al. | 325/158.
|
5548527 | Aug., 1996 | Hemminger et al. | 364/492.
|
5555508 | Sep., 1996 | Munday et al. | 364/492.
|
5631554 | May., 1997 | Briese et al. | 324/76.
|
Primary Examiner: Hoff; Marc S.
Assistant Examiner: Miller; Craig Steven
Attorney, Agent or Firm: Woodcock Washburn Kurtz Mackiewicz & Norris LLP
Parent Case Text
RELATED APPLICATION DATA
The present application claims priority from PCT application No.
CT/US97/18457, having an international filing date of Oct. 16, 1997, which
claims priority from provisional application Serial No. 60/028,986, filed
on Oct. 22, 1996.
Claims
What is claimed is:
1. A system for determining the service type to which an energy meter
having at least one meter element is connected, comprising:
storage means for storing reference information reflective of at least one
service type;
means for determining which of said meter elements of said energy meter are
active;
means for determining a plurality of relative phase angles of said active
meter elements;
means for determining a plurality of phase voltages of said active meter
elements; and
means for retrieving said reference information from said storage means and
comparing said relative phase angles and said phase voltages with said
reference information to determine the service type.
2. The system according to claim 1, wherein said means for determining
which of said meter elements are active comprises means for determining a
number of meter elements in the service type.
3. The system according to claim 1, wherein said means for determining
which of said meter elements are active comprises at least one of a
digital signal processor (DSP) and an analog/digital (A/D) converter.
4. The system according to claim 1, wherein said storage means comprises a
memory.
5. The system according to claim 4, wherein said memory comprises an
EEPROM.
6. The system according to claim 1, wherein said means for retrieving and
comparing comprises a microcontroller.
7. The system according to claim 1, wherein said means for determining said
phase voltages comprises power quality monitoring instrumentation.
8. The system according to claim 1, further comprising means to store the
service type in said storage means.
9. The system according to claim 8, wherein said means to store the service
type is one of automatic and manual.
10. The system according to claim 9, wherein said manual means to store the
service type is user-activated.
11. The system according to claim 9, wherein said automatic means to store
the service type is triggered when the service type is determined.
12. The system according to claim 1, wherein said storage means is
programmable to change said reference information.
13. The system according to claim 12, wherein said reference information
includes at least one of services and scaling information, a nominal
service voltage, a programmable potential indicator threshold, and a
maximum and a minimum tolerance with respect to said nominal service
voltage.
14. The system according to claim 1, further comprising means for
activating the system at at least one of startup and at a predetermined
time during system operation.
15. The system according to claim 14, wherein said predetermined time is
periodic.
16. The system according to claim 1, wherein said means for determining
said relative phase angles of said meter elements comprises means for
determining said relative phase angles to be one of an ABC and a CBA
rotation.
17. The system according to claim 1, further comprising means for
determining the number of phases present in the service type.
18. The system according to claim 1, further comprising means for
displaying the service type.
19. The system according to claim 18, wherein said means for displaying the
service type is an LCD display.
20. A method for determining the service type to which an energy meter
having at least one meter element is connected, comprising the steps of:
storing reference information reflective of at least one service type in a
memory;
determining which of said meter elements of said energy meter are active;
determining a plurality of relative phase angles of said active meter
elements;
determining a plurality of phase voltages of said active meter elements;
retrieving said reference information from said memory and comparing said
relative phase angles and said phase voltages with said reference
information; and
determining the service type based on a result of said step of comparing.
21. The method according to claim 20, wherein said step of determining
which of said meter elements are active comprises determining a number of
meter elements in the service type.
22. The method according to claim 20, wherein said step of determining
which of said meter elements are active comprises digital signal
processing.
23. The method according to claim 20, wherein said step of determining said
phase voltages comprises instrumentation measuring.
24. The method according to claim 20, further comprising the step of
storing the service type in said memory.
25. The method according to claim 24, wherein said step of storing the
service type in said memory is one of automatic and manual.
26. The method according to claim 25, wherein the step of storing the
service type is user-activated.
27. The method according to claim 25, further comprising the step of
triggering said step of storing the service type in said memory responsive
to determining the service type.
28. The method according to claim 20, further comprising the step of
changing said reference information.
29. The method according to claim 20, further comprising the step of
activating the system at at least one of startup and at a predetermined
time during system operation.
30. The method according to claim 29, wherein said predetermined time is
periodic.
31. The method according to claim 20, wherein said step for determining
said relative phase angles of said meter elements comprises the step of
determining said relative phase angles to be one of an ABC and a CBA
rotation.
32. The method according to claim 20, further comprising the step of
determining the number of phases present in the service type.
33. The method according to claim 20, further comprising the step of
displaying the service type.
Description
FIELD OF THE INVENTION
The present invention relates generally to electronic energy meters, and
more particularly to highly functional programmable electronic energy
meters with systems for service identification and power quality analysis.
BACKGROUND
Programmable electronic energy meters are rapidly replacing
electro-mechanical meters due to the enhanced functionality achieved using
programmable logic integrated into solid-state electronic meters. Some of
these meters can be used to meter various different electrical services
without hardware modification. For example, meters having a voltage
operating range between 98 Vrms to 526 Vrms are capable of operation with
either 120 V or 480 V services. U.S. Pat. No. 5,457,621, dated Oct. 10,
1995, entitled SWITCHING POWER SUPPLY HAVING VOLTAGE BLOCKING CLAMP,
assigned to ABB Power T&D Company discloses examples of such meters. In
addition, some meters are constructed for use with any 3-wire or any
4-wire service, also disclosed in U.S. Pat. No. 5,457,621. Unless meters
having this versatility are used, utilities must be careful to install the
correct meter in relation to both configuration and electrical service
supplied at the installation site. Unfortunately, meter installers are not
always trained to detect or note service particularities which might
indicate that the meter to be installed is not configured properly for a
particular installation.
For this reason, some utilities configure the meters themselves to ensure
better control over which meters are installed at which installation
sites. However, such configuration activity adds to the installation cost
and does not always reduce the risk that a meter configured for one
service might inadvertently be installed at a site supplied by a different
service. Therefore, there remains a need for an electronic meter which
automatically detects the service type and voltage to which the meter is
installed and which either automatically configures its own programming to
the detected service or provides a simple means for manual configuration
at the installation site.
Further, the performance of power quality tests requires that the type of
service and service voltage be known prior to installation so that the
meter's programming can be locked to the appropriate service-dependent
thresholds utilized in connection with particularized power quality tests.
Therefore, for this additional reason, there remains a need for an
electronic meter to automatically detect the service type and voltage to
which the meter is installed and which automatically configures its
programming to the detected service.
In addition, many new electronic energy meters have begun to take advantage
of their programming capabilities by providing limited diagnostic and/or
power quality testing. These capabilities are provided by programming
stored in read only memory (ROM). Thus, these meters are currently limited
in operation to predefined programming, such as predefined sets of tests.
Significantly, such meters are also limited to the measurement of only a
predetermined set of parameters that have been programmed into such
meters, i.e., stored in ROM, during manufacture. Consequently, any change
to the measurements or tests supported by the meter must be carried out by
replacing the meter's ROM, i.e., by factory modification. Therefore, there
also exists a need for a more flexible electronic energy meter that
permits the addition of new measurements or testing capabilities without
requiring factory modifications to effect such functionality changes.
SUMMARY OF THE INVENTION
The above problems are overcome and the advantages of the invention are
achieved in methods and apparatus for metering electrical energy in an
electronic meter which automatically detects the service type and voltage
to which the meter is installed and which either automatically configures
its own programming to the detected service or provides a simple means for
manual configuration at the installation site. The electronic energy meter
also permits the addition of new measurements or testing capabilities
without requiring factory modifications to effect such functionality
changes.
The present invention is directed to a system for determining the service
type to which an energy meter having meter elements is connected,
comprising: storage means for storing reference information reflective of
different service types; means for determining which of the meter elements
of the energy meter are active; means for determining a plurality of
relative phase angles of the active meter elements; means for determining
a plurality of phase voltages of the active meter elements; and means for
retrieving the reference information from the storage means and comparing
the relative phase angles and the phase voltages with the reference
information to determine the service type.
According to one aspect of the present invention, the means for determining
which of the meter elements are active comprises means for determining a
number of meter elements in the service type.
In accordance with a further aspect of the present invention, the means for
determining which of the meter elements are active comprises at least one
of a digital signal processor (DSP) and an analog/digital (A/D) converter.
In accordance with further aspects of the present invention, the storage
means comprises a memory, preferably is programmable, such as an EEPROM,
the means for retrieving and comparing comprises a microcontroller, and
the means for determining the phase voltages comprises power quality
monitoring instrumentation.
In accordance with a further aspect of the present invention, automatic or
manual means are provided to store the service type in the storage means.
The automatic means to store the service type is triggered by the
determination of the service type. The manual means is user-activated.
In accordance with a further aspect of the present invention, the reference
information includes at least one of services and scaling information, a
nominal service voltage, a programmable potential indicator threshold, and
a maximum and a minimum tolerance with respect to the nominal service
voltage.
In accordance with a further aspect of the present invention, means are
provided for activating the system at at least one of startup and at a
predetermined time during system operation. In an embodiment, the
predetermined time is periodic.
In accordance with a further aspect of the present invention, the means for
determining the relative phase angles of the meter elements comprises
means for determining the relative phase angles to be an ABC or a CBA
rotation.
In accordance with a further aspect of the present invention, means are
provided for determining the number of phases present in the service type,
and means, preferably an LCD display, are provided for displaying the
service type.
Another embodiment within the scope of this invention includes a method for
determining the service type to which an energy meter having meter
elements is connected, comprising the steps of: storing reference
information reflective of different service types in a memory; determining
which of the meter elements of the energy meter are active; determining a
plurality of relative phase angles of the active meter elements;
determining a plurality of phase voltages of the active meter elements;
retrieving the reference information from the memory and comparing the
relative phase angles and the phase voltages with the reference
information; and determining the service type based on a result of the
step of comparing.
BRIEF DESCRIPTION OF THE DRAWINGS
The present invention will be better understood, and its numerous objects
and advantages will become apparent, by reference to the following
detailed description of the invention when taken in conjunction with the
following drawings, in which:
FIG. 1 is a block diagram showing the functional components of an exemplary
meter and their interfaces in accordance with the present invention;
FIG. 2 is a functional block diagram showing the logic that may be employed
by a digital signal processor (DSP) to drive the potential indicators in
accordance with the present invention;
FIG. 3 is a diagram showing the functional grouping of data into tables and
the meter relationship among the tables as implemented in a preferred
embodiment of the invention;
FIG. 4 is a state diagram showing the measurement states within a preferred
embodiment of the invention;
FIG. 5 is a functional diagram showing the system architecture for
performing instrumentation measurements and power quality monitoring as is
implemented in accordance with a preferred embodiment of the invention;
FIG. 6 is a context diagram showing an exemplary measurement engine
processing utilizing internal flags in accordance with the present
invention;
FIG. 7 is an example of a state transition diagram for the measurement
engine in accordance with the present invention;
FIGS. 8A-8E are detailed functional flow diagrams showing the steps carried
out by the measurement engine in accordance with a preferred embodiment of
the invention;
FIGS. 9A and 9B show a context diagram for an exemplary power quality test
engine processing utilizing internal flags in accordance with the present
invention;
FIGS. 10A and 10B are a series of state diagrams showing exemplary power
quality engine resource processing scenarios in accordance with present
invention;
FIGS. 11A-11I are detailed functional flow diagrams showing the steps
carried out by the power quality test engine in accordance with a
preferred embodiment of the invention;
FIG. 12 is a flow diagram showing the steps carried out by an exemplary
microcontroller in accordance with the present invention to automatically
and electronically identify the service definition;
FIG. 13 is a detailed flow diagram showing an exemplary service phase table
search in accordance with the present invention;
FIG. 14 is a detailed flow diagram showing an exemplary service voltage
table search in accordance with the present invention;
FIG. 15 is a state diagram showing the states for exemplary service lock
processing according to the present invention;
FIG. 16 is a flow diagram of an exemplary service test and display features
in accordance with the present invention; and
FIG. 17 is a flow diagram of an exemplary flicker determination and display
feature in accordance with the present invention.
DETAILED DESCRIPTION OF THE INVENTION
A. Operational Overview
The present invention provides comprehensive power quality monitoring and
diagnostic features in connection with metering single and poly-phase
electrical energy. FIG. 1 is a block diagram showing the functional
components of an exemplary meter and their interfaces in accordance with
the present invention. As shown in FIG. 1, a meter for metering
three-phase or single phase electrical energy preferably includes a
digital LCD type display 30, a meter integrated circuit (IC) 14 which
preferably comprises A/D converters and a programmable DSP, and a
microcontroller 16.
Analog voltage and current signals propagating over power transmission
lines between the power generator of the electrical service provider and
the users of the electrical energy are sensed by voltage dividers 12A,
12B, 12C and current transformers or shunts 18A, 18B, 18C, respectively.
The outputs of the resistive dividers 12A-12C and current transformers
18-18C, or sensed voltage and current signals, are provided as inputs to
meter IC 14. The A/D converters in the meter IC 14 convert the sensed
voltage and current signals into digital representations of the analog
voltage and current signals. In a preferred embodiment, the A/D conversion
is carried out as described in U.S. Pat. No. 5,544,089 dated Aug. 6, 1996,
and entitled PROGRAMMABLE ELECTRICAL METER USING MULTIPLEXED
ANALOG-TO-DIGITAL CONVERTERS, assigned to ABB Power T & D Company. The
digital voltage and current signals are then input to the programmable DSP
in the meter IC 14 for generating pulsed signals 42, 44, 46, 48
representing various power measurements, i.e., each pulse represents the
Ke value associated with Watts, VAs, or VARs. These pulsed signals may be
processed by the microcontroller 16 to perform revenue metering functions
for billing purposes.
The exemplary microcontroller 16, in accordance with the present invention,
performs numerous revenue metering functions, as well as instrumentation
functions. Instrumentation functions, in contrast to revenue functions,
are intended to assist a technician in evaluating a service based on
near-instantaneous conditions at the meter. Instrumentation measurements
may include system parameters such as frequency, Watts, VARs, and VAs, and
per phase information such as voltage, current, phase angles, power
factor, current to voltage angle, kWatts, kVARs, kVA, and harmonic
distortion related parameters. Table 1 lists some examples of
instrumentation parameters that may be computed by the present invention.
TABLE 1
______________________________________
Parameter Description
______________________________________
Frequency Measured on A Phase voltage.
System kWatts Signed sum of the kW measurement on each
phase taken moments apart.
System kVARs Root-mean square-difference of the System
(Arithmetic) kVAs (Arithmetic) and System kWatts.
System kVARs (Vectorial) Signed sum of the kVAR measurement on
each phase taken moments apart.
System kVAs (Arithmetic) Sum of the kVA measurements on each
phase taken moments apart.
System kVAs (Vectorial) Root-mean square-sum of the System
kWatts and the System kVARs (Vectorial).
System Power Factor System kWatts divided by the System kVAs
(Arithmetic) (Arithmetic).
System Power Factor System kWatts divided by the System kVAs
(Vectorial) (Vectorial).
Phase Voltages and Measurements are true RMS; each phase
Amperes voltage and current is measured
simultaneously.
Phase Voltage Angle Each phase angle is measured relative to
related to Phase A Phase A zero crossings, rounded to 30
Voltage degrees.
Phase Power Factor Phase kWatts, divided by Phase kVAs
(measured simultaneously).
Phase Current to Phase Inverse cosine of Phase Power Factor (prior
Voltage Angle to rounding), rounded to 0.1 degrees.
Phase Current to Phase Phase Current to Phase Voltage
Angle, plus
Voltage Angle Plus the nominal Phase Voltage Angle relative to
Voltage Angle Relative to Phase A voltage for the service.
Phase A Voltage
Phase kWatts, kVAs Each phase kWatts and kVAs is measured
simultaneously.
Phase kVARs Root-mean square-difference of the Phase
kVAs and Phase kWatts.
Total Harmonic Distortion Square root of the sum of the squares of the
(THD) Indication second through fifteenth fundamental
values
of the Phase Voltage or Phase Current,
divided by the phase quantity's fundamental
magnitude.
2nd Harmonic Voltage The phase quantity's 2nd Harmonic Voltage
Distortion Indication Magnitude, divided by the phase quantity's
fundamental magnitude.
General Nth Voltage Measurements are true RMS.
Harmonic Magnitude
General Nth Harmonic Measurements are true RMS.
Magnitude
______________________________________
The meter IC 14 and the microcontroller 16 each preferably interface with
one or more memory devices through an IIC bus 36. An EEPROM 35 is provided
to store revenue data as well as programs and program data. Upon power up
after installation, a power failure, or a data altering communication, for
example, selected programs and program data stored in the EEPROM 35 may be
downloaded to the program RAM and data RAM associated with the meter IC
14, as shown in FIG. 1. The DSP under the control of the microcontroller
16 processes the digital voltage and current signals in accordance with
the downloaded programs and data stored in the respective program and data
RAM.
To perform instrumentation functions, the microcontroller 16 may use
voltage and current, real and apparent energy with lead/lag indication,
frequency, and relative voltage or current phase angle information from
the DSP. According to a preferred embodiment of the present invention, the
meter IC 14 monitors the digital phase voltage signals and phase current
signals over two line cycles (at about 50 or 60 Hz, two line cycle
measurements are defined herein as RMS measurements even though they are
"near-instantaneous") and then computes the RMS voltage and current
values, real and apparent energies with lead/lag indication, average
frequency, or relative voltage or current phase angle information. It
should be understood that the number of line cycles is preferably
programmable and a different number of line cycles, such as one line cycle
for example, may be used for designated measurements. The RMS parameters
are computed for a single phase at a time and stored in the data RAM in IC
14. The microcontroller 16 polls for data in these registers via the IIC
bus 36 for requested instrumentation measurement. Because the
instrumentation measurements are near-instantaneous, no values are stored
other than the ones presently being requested.
The DSP in the meter IC 14 also drives potential indicators lines 41, 43,
and 45. Microcontroller 16 echoes the line states to potential indicators
27, 29, and 31 which are preferably designated sections on the LCD 30.
Potential indicators for each phase remain lit for as long as the
corresponding phase potential is present.
FIG. 2 shows a functional block diagram for exemplary logic that may be
employed by the DSP in the IC 14 to drive the potential indicators 27, 29,
and 31 in accordance with the present invention. While the logic for only
one phase is shown, it should be understood that the logic is preferably
replicated for each phase. As shown in FIG. 2, the digital samples for
each phase voltage are provided to an RMS measurement generator 51. In a
preferred embodiment, the RMS measurement generator computes the RMS
measurements in accordance with the following formula:
##EQU1##
where N equals the number of samples per a selected number of line cycle
intervals.
A programmable potential indicator threshold 53 is preferably downloaded
from the EEPROM 35 to the data RAM in the IC 14. Although initial
programmable thresholds are downloaded following power-up, it is also
preferable that the potential indicator thresholds be updated following
certain system tests which are described in detail below. A comparator 55
compares the RMS measurement from the RMS measurement generator 51 with
the potential indicator threshold 53 and generates an output that is high
whenever the RMS measurement exceeds the programmable potential indicator
threshold. The output of the comparator 55 is provided to the
microcontroller 16. Referring back to FIG. 1, phase A, B, and C potential
signals are output from the meter IC 14 to the microcontroller 16, which
in turn drives the potential indicators 27, 29, and 31 so that the
potential indicator remains lit when the corresponding potential signals
are high.
The present invention preferably utilizes three display modes for the LCD
30, namely, normal, alternate, and test modes. On power-up following
installation, at a preset time, or following a data altering
communication, programmably designated tests are preferably executed.
Following the tests, in the normal display mode, in a preferred
embodiment, the meter sequentially and continuously scrolls through
display items selected for the normal display mode. The display items may
include both revenue data and instrumentation parameters.
The alternate mode and test mode are manually initiated in a preferred
embodiment. Different and/or additional display items may also preferably
be selected for display in the alternate and test modes. The alternate
mode preferably either scrolls through the selected parameters once or can
be made to manually step through the displayed items. Items or parameters
selected for display during test mode are continuously scrolled until the
test mode is manually terminated.
The tests that are performed by the present invention may be categorized as
operating error tests, system tests, power quality tests, and flicker
tests.
The operating error tests are used to identify those conditions that may
affect revenue data, such as power outage carryover errors, configuration
errors, EEPROM errors, and the like. These errors are displayed when they
are detected and are preferably locked on the display.
The system tests include a system service voltage test (hereinafter
referred to as a "service test") and a system current test. Generally, the
service test is used to verify that the voltage phase angles are within a
predefined range for the particular service and that the phase voltages
are within a predefined voltage range of the valid service nominal
voltages. The system current tests may check for low current conditions,
over current conditions, under current conditions, reverse power, and/or
improper power factor conditions.
The power quality tests permit testing and evaluation for the following
conditions: abnormal service voltage, abnormally high or low voltage,
abnormally low or high current, abnormal leading or lagging power factor,
and various harmonic distortions, as well as other abnormal conditions.
Flicker tests monitor the phase potentials signals for frequent temporary
losses of phase potential.
Following power-up at installation, a service test is preferably performed
to identify and/or check the electrical service. The present invention may
be preprogrammed for use with a designated service or it may determine the
service using a service test. When the service test is used to identify
the electrical service, an initial determination is made of the number of
active elements. To this end, each element (i.e., 1, 2 or 3 elements) is
checked for voltage, for example, by monitoring the outputs of comparator
55 in FIG. 2 for each phase. Once the number of elements is identified,
many of the service types can be eliminated from the list of possible
service types. The voltage phase angle relative to phase A may then be
calculated and compared to each phase angle for abc or cba rotations with
respect to the remaining possible services, e.g., within +15.degree.. If a
valid service is found from the phase angle comparisons, the service
voltage is preferably determined by comparing the RMS voltage measurements
for each phase with nominal phase voltages for the identified service. If
the nominal service voltages for the identified service matches measured
values within an acceptable tolerance range, a valid service is identified
and the phase rotation, service voltage, and service type are preferably
displayed. The service may be locked, i.e., the service information is
stored in the EEPROM 35, manually or automatically.
When the service type is known in advance and locked, the service test
preferably checks to ensure that each element is receiving phase potential
and that the phase angles are within a predetermined percentage of the
nominal phase angles for the known service. The per-phase voltages are
also measured and compared to the nominal service voltages to determine
whether they are within a predefined tolerance range of the nominal phase
voltages. If the voltages and phase angles are within the specified
ranges, the phase rotation, the service voltage, and service type are
displayed on the meter display. If either a valid service is not found or
the service test for a designated service fails, a system error code
indicating an invalid service is displayed and locked on the display to
ensure that the failure is noted and evaluated to correct the error.
The present invention may also be programmed so that immediately following
the service test after installation, power-up, etc., the alternate mode is
initiated. In order to avoid crowding the normal display, it is preferred
that the instrumentation parameters and the system tests be included in
the alternate display mode and not the normal display mode. It is also
preferred that the service test and the system current test be specified
as the first and second parameters of the alternate display, respectively.
If the service test or system current test fail while in the alternate
mode, a system error code indicating the error is displayed in the
alternate scroll sequence. Examples of possible system error codes
designated by an "SER XXXXXX" error message are shown in Table 2.
TABLE 2
______________________________________
V V V I I I
A B C A B C
______________________________________
Unknown Service Angles SEr 5 5 5 0 0 0
Missing A Phase Current SEr 0 0 0 1 0 0
Missing B Phase Current SEr 0 0 0 0 1 0
Missing C Phase Current SEr 0 0 0 0 0 1
Low A Phase Current SEr 0 0 0 2 0 0
Low B Phase Current SEr 0 0 0 0 2 0
Low C Phase Current SEr 0 0 0 0 0 2
Inappropriate PF on A Phase SEr 0 0 0 4 0 0
Inappropriate PF on B Phase SEr 0 0 0 0 4 0
Inappropriate PF on C Phase SEr 0 0 0 0 0 4
Reverse Power on A Phase SEr 0 0 0 5 0 0
Reverse Power on B Phase SEr 0 0 0 0 5 0
Reverse Power on C Phase SEr 0 0 0 0 0 5
Excess Current on A Phase Current SEr 0 0 0 8 0 0
Excess Current on B Phase Current SEr 0 0 0 0 8 0
Excess Current on C Phase Current SEr 0 0 0 0 0 8
______________________________________
If multiple tested conditions fail, the associated system error codes may
be added together so that a single error code is displayed in the
appropriate sequence. In a preferred embodiment, the error codes are
hexadecimal values so that an excess current condition "8" and an
inappropriate power factor "4" would be reported as "C."
Any system test selected for the alternate mode display is preferably not
carried out until the results are to be displayed. Therefore, the
measurements made in connection with the system tests do not require
storage in memory. Similarly, no instrumentation parameters selected for
the alternate mode display are preferably calculated until they are to be
displayed.
Referring back to FIG. 1, the exemplary meter according to the present
invention also provides for remote meter reading, remote power quality
monitoring, and reprogramming through an optical port 40 and/or an option
connector 38. Although optical communications may be used in connection
with the optical port 40, the option connector 38 may be adapted for RF
communications or electronic communications via modem, for example.
Revenue functions, communications, system tests, flicker testing, and
instrumentation features preferably have priority in terms of processing
over power quality tests. Therefore, the power quality tests are processed
in the background. Although the designated power quality tests are run
one-at-a-time in a fixed selected sequence, they are only run when
processing time is available, and accordingly, not at fixed intervals.
However, it should be understood that certain power quality tests could be
given higher priority such that those higher priority tests could be
carried out at fixed intervals.
When an abnormal condition is detected by any of the designated power
quality tests (which may include the service tests and/or system current
tests), a predefined code indicative of an abnormal condition is
preferably optionally injected as the first item in the normal scroll
sequence. However, since the condition is not necessarily related to one
specific error, it is considered a warning or a flag condition and display
of the predefined code preferably does not affect the operation of the
meter. Whether or not particular abnormal conditions drive a warning on
the display may be selected through programmable options.
The warnings may be time and date stamped and logged in an event log and
the number of events and cumulative time of the conditions may be
separately logged in an occurrence log. The logs are preferably stored in
the EEPROM 35 shown in FIG. 1. The information stored in these logs may be
accessed through software for further diagnostic processing and evaluation
external to the meter itself.
The systems for performing system, power quality, and flicker tests
according to the present invention are preferably implemented in firmware,
wherein such operations are enabled by the correct programming of several
data tables. The functional inter-relationships of these tables is shown
in FIG. 3. System current tests are performed utilizing data stored in
records in the system current test table 114 which generally includes
system current thresholds for each service supported by the meter. Service
tests are performed utilizing the data records stored in the service angle
table 116 and the service voltage table 118. The records in the service
angle table 116 may preferably include the nominal phase angle information
for each service supported by the meter, whereas the records in the
service voltage table 118 may preferably include the nominal voltage and
tolerances for each service and a corresponding potential indicator
threshold. A separate table, the phase tolerance table 115, is preferably
used in connection with the service voltage test stored in EEPROM 35. Once
the service is locked, the data corresponding to the service is
transferred from tables 114, 116, and 118 to a thresholds table 122.
The power quality tests preferably form a predefined set of comparison
tests. A record is stored in a power quality test table 108 for each
comparison test to be carried out by the meter. The comparison tests and
associated records are stored in a comparison test table 110. The power
quality test table 108 also may include information referencing a
measurement record for the measurement to be tested by the referenced
comparison test. The power quality test table 108 additionally references
threshold information for test comparisons from the thresholds table 122.
The measurement records are stored in a measurement table 100 which
preferably includes information referencing a record in the measurement
function table 102. The records in the measurement function table 102
identify a DSP function to be performed and may additionally reference a
record in the constant table 104 which may include initialization and
calibration constants used to carry out the functions. The records in the
measurement table 100 may also reference a record in a conversion table
106 which specifies particular computations to be performed in connection
with the specified DSP function to complete the measurement desired for
comparison by the power quality test.
The DSP program in conjunction with the DSP hardware implements the
fundamental measurement capabilities of the meter. The preferred
embodiment has provisions for different versions of DSP programs to
provide the capability to perform additional fundamental measurements. In
the preferred embodiment, a DSP address and internal RAM page selector 121
are provided to the power quality measurement engine to allow the engine
to communicate with versions of DSP programs that may have different IIC
addresses and/or internal RAM addresses.
Programming for the data tables shown in FIG. 3 can preferably be divided
into four levels of activities: (1) Display and Test Selection; (2)
Display and Test Parameter Adjustment; (3) Test Definition; and (4)
Measurement Definition.
Display selection involves the insertion of predefined byte sequences into
a display table to enable the meter to display predefined measurement
quantities. Test selection involves the insertion of predefined byte
sequences into the power quality test table 108 to enable the meter to
perform predefined power quality tests.
Display parameter adjustment involves changing the number of line cycle
pairs over which a given electrical measurement is performed as indicated
by the selected function. Test parameter adjustment involves the
modification of voltage, current, power factor, and time thresholds in the
system current test table 114, the service phase table 116, the service
voltage table 118, and the power quality test table 108 to effect the
sensitivity of the various tests that can be performed.
Test definition involves the creation of new power quality tests by new
combinations of test parameter threshold in tables 114, 116, and 108 with
defined electrical measurements.
Measurement definition involves the creation of new electrical measurements
by new combinations of DSP functions and computations.
New hardware capabilities are added via the measurement function table 102
and the constants table 104. Moreover, new computations can be added or
defined via the conversion table 106 or by specifying a sequence of
computations from the conversion table 106. New measurements can be added
by either combining new DSP functions with computations, DSP functions
with new computations, or new DSP functions with new computations, into
new measurement records.
B. Instrumentation Measurement and Monitor Interaction
FIG. 4 shows a state diagram of the measurement states within a preferred
embodiment of the invention. The measurement routines are executed by a
measurement engine which is described in detail below. The measurement
engine remains in the idle state 140 until a request for measurement is
received. Measurement requests may be initiated for the purpose of
displaying an instrumentation parameter, performing a power quality test,
or for transmitting a measured parameter via external communications.
A display measurement request 136 may be received when a quantity is
desired for display in one of the display modes supported by the meter.
Upon receipt of a display measurement request 136, the measurement engine
transitions to the display measurement processing state 144 and remains in
that state 144 until the measurement is computed, stored in a register,
and retrieved for display. In a preferred embodiment, the measurement
engine remains in the display measurement processing state 144 until (1)
the measurement is computed, stored in a register and retrieved for
display, (2) until a higher priority measurement request is received, or
(3) an error occurs as a result of processing the display request. After
the measurement is completed, the display request processing state
transitions at 138 back to the idle state 140.
As shown in FIG. 4, so long as background testing is enabled, a power
quality measurement request 130 may be received. The power quality
measurement request 130 designates which measured quantity is to be used
in a current power quality test, e.g., phase B RMS voltage for comparison
to a maximum acceptable voltage level for phase B, given the locked
service. When received, the measurement engine transitions from the idle
state 140 to the power quality measurement processing state 146 where the
measurement designated by the power quality measurement request 130 is
processed. The measurement is stored in a register which is accessed by a
power quality test engine (described below in detail) so that the power
quality test can be carried out utilizing the measured quantity. In a
preferred embodiment, the power quality test engine acknowledges receipt
of the measured quantity. The measurement engine remains in state 146
until the measurement is done. When the power quality measurement
processing is complete, the measurement engine transitions at 132 to the
idle state 140.
An external communication request 154 may be received via optical
communications or electronically from an external source in which a
particular measurement is requested for transmission to the external
source. When a request 154 is received, the measurement engine transitions
from the idle state 140 to the communication measurement processing state
142. The designated measurement is processed and stored in a register
accessible by the communications routines of the meter. When the
measurement is done, the measurement engine transitions at 152 back to the
idle state 140.
In a preferred embodiment, meter communications has priority over both
measurement display functions and power quality testing. Similarly,
display measurement functions have priority over power quality testing.
Thus, if the measurement engine is in the power quality measurement
processing state 146 and a display measurement request 136 is received,
the measurement engine transitions at 151 to the display measurement
processing state 144. Any computations or measurement data generated
before transitioning to the display measurement processing state 144 is
preferably not saved, and therefore, the power quality measurement is
reinitiated when the measurement engine returns to the idle state 140
after display measurement processing is complete.
In a similar manner, if a communication measurement request 154 is received
while the measurement engine is in either the power quality measurement
processing state 146 or the display measurement processing state 144, the
measurement engine transitions at 150 and 158, respectively, to the
communication measurement processing state 142. In a preferred embodiment,
no data generated in either state 146 or state 144 is stored after
transitioning to state 142. Consequently, a new power quality measurement
request 130 or display measurement request 136 is initiated to invoke the
interrupted measurement processing after the communication measurement
processing is complete and the measurement engine returns to the idle
state 140.
The system architecture for performing instrumentation measurement and
power quality monitoring is implemented in accordance with a preferred
embodiment of the invention as shown in FIG. 5. The system architecture is
functionally divided into two engines, the measurement engine 50 and the
power quality engine 52.
Instrumentation measurements may be selected for display by programming (1)
a measurement record number, (2) formatting information, and (3) phase to
measure in a display table which defines the display sequence. An example
of the information that might be included in a display table is set forth
in Table 3.
TABLE 3
______________________________________
Electrical Measurements and Measurement Record (MR) Numbers
MR # Name
______________________________________
1 Frequency
2 Current * 10, Voltage * 10
3 Total power factor angle (arithmetic)
4 KVA, KW
5 Current
6 Voltage
7 KVAR
8 PF Angle
9 KW
10 2nd Harmonic Current Magnitude
11 V Angle
12 I Angle
13 Percent 2nd Harmonic Voltage
14 Total Power KVARs, KWatts (Vectorial)
15 Total Power KWatts (Vectorial and Arithmetic)
16 Total VA (Vectorial)
17 Total PF
18 Total PF Angle
19 V THD
20 I THD
21 Total Power KVA, KWatts (Arithmetic)
22 Total VAR (Arithmetic)
23 Total PF (Arithmetic)
24 Single Phase Power Factor
25 Electrical System Service Determination
26 System Current Tests
______________________________________
The display table is preferably generated and written to the meter EEPROM
35 so that the information can be accessed by both the microcontroller 16
and the DSP in the meter IC 14 during meter operation.
As discussed above, instrumentation measurements may also be desired for
power quality tests. The power quality engine 52 allows the meter to
monitor and log various conditions of the power line. A power quality test
may be constructed by combining any instrumentation measurement, for
example, in Table 3, with a comparison test which may utilize test
parameters configured by the service test, i.e., threshold values based on
the locked service. Records of this nature are stored in the power quality
test table shown generally in FIG. 3 and described in detail below.
Therefore, the display configuration table preferably includes two entry
definitions, one for normal display quantities and one for power quality
measurements. The definitions can be mixed within the table to obtain the
desired display sequence. Power quality measurements are considered
instrumentation quantities as opposed to billing quantities. If a power
quality measurement is selected which is unavailable in a given meter or
installed service, the meter preferably skips the display with no warning
or error. This is desirable so that a single pre-defined display table
will work in multiple applications regardless of the rate for which the
program was generated.
Referring again to FIG. 5, the power quality engine 52 retrieves a
measurement record number 67 from the next power quality test record and
generates a power quality measurement request comprising a measurement
record number 66. The request references one of the measurement records
from the measurement table. A measurement record generally comprises a
function/constant index, a conversion routine index, and a pointer to the
next measurement record. The function index references one of a predefined
set of measurement functions that the DSP may perform. The constant index
references initialization constants and service-dependent constants based
on the locked service. The conversion routine index references one of a
set of predefined conversion routines that operate on the data manipulated
and returned by the DSP. Examples of conversion routines include
computational routines such as scaling, square root or trigonometric
functions, system test routines, iteration routines, expansion routines,
and power measurement computation routines, to name a few.
To better understand the measurement process, consider the situation in
which the phase angle for the current I.sub.B is desired to be displayed.
The microprocessor references a measurement record and invokes the DSP
function designated in that record via bus 36 to the DSP. In this example,
the DSP function returns Watts and VA on phase B over a designated number
of line cycles. When the DSP completes these measurements, the
measurements are stored in the return registers in data RAM. The
microcontroller 16 polls for these measurements and retrieves them over
the bus 36 when they are available. Then the microcontroller 16 performs
the conversion routine referenced by the measurement. In the present
example, the conversion routine would call for dividing the watts
measurement by the VA measurement to compute the power factor for phase B.
The next record field would then reference the next measurement record to
be processed. That record would include a reference to the conversion
routine for determining the arccosine of the power factor to arrive at the
phase angle associated with phase B current.
In FIG. 5, the measurement engine 50 is shown processing a measurement
record for power quality monitoring purposes although the measurement
record processing is preferably the same for display processing. In either
case, the measurement record number is shown at 67, the conversion index
is shown at 58, and the function index is shown at 56. The measurement
engine 50 thus performs the designated DSP function and computational
routines specified by respective function and conversion indices of the
measurement record identified by the power quality measurement request.
The measurement engine 50 then processes the next measurement record
designated in the next measurement record field of the current measurement
record.
FIG. 6 is a context diagram showing the measurement engine processing
utilizing internal flags in accordance with the present invention. In a
preferred embodiment, the DSP is capable of being programmed to perform
several different types of measurement functions such as voltage, current,
power, apparent power, frequency, harmonic content, etc., on the meter
inputs. Of course, the DSP could be replaced by any type of device, or
system that is capable of producing a fundamental measurement. For this
discussion the production of any fundamental measurement by such a system
is referred to as a DSP conversion. The measurement engine provides the
capability to combine sequences of fundamental measurements and
mathematical computations (referred to as conversion routines) to produce
an instrumentation measurement.
The context diagram in FIG. 6 shows that a measurement requester 111 such
as the power quality monitor engine starts the measurement engine 120 by
providing a measurement record number, a description of the meter phase or
phases that are to be measured, a flag indicating whether or not
intermediate working register R0 should be saved before beginning, and a
flag indicating whether or not DSP conversion should be performed before
the conversion routine is executed. The measurement engine 120 responds by
clearing the measurement finished flag 123 and returning a flag indicating
that the measurement has been started. The measurement engine 120 then
operates independently from the requester 111 to interpret a linked list
of measurement records in the measurement table to produce a measurement
result for the requester.
In a preferred embodiment, if the measurement engine 120 is started before
a previous measurement request has been completed, the first measurement
request will be aborted and the second request will be performed.
Contention for the measurement engine 120 is avoided by a priority scheme.
Three levels of priority are used: background priority, foreground
priority, and communication priority. The power quality monitor engine
operates at the background priority, the meter display operates at the
foreground priority, and devices communicating via a communications
protocol operate at the communications priority. Other embodiments might
provide other means for handling multiple measurement requests such as,
but not limited to: requiring a measurement request to be finished before
another can be started, allowing additional measurement requests to be
queued and processed one at a time, interrupting the measurement request
in process until the new request is processed, or processing the
measurement requests in parallel.
FIG. 7 is an example of a state transition diagram for an exemplary
measurement engine 50 in accordance with the present invention and FIGS.
8A-8E are more detailed functional flow diagrams showing the steps carried
out by the measurement engine 50 in accordance with a preferred embodiment
of the invention. In FIG. 7, the circles represent states and the boxes
represent actions. The labeled lines represent the conditions that allow
transition between states.
During the Idle state 200, the measurement engine waits for a Start Test
event 202. The Start Test event 202 provides the measurement engine with a
test number and specifies the phase or phases on which to perform the
test. The test number is used as an index into a linked list of test
records. Each test record can specify zero or one DSP measurement requests
and several kinds of conversion routines. If the EEPROM tables used by the
measurement engine have valid checksums (indicating that the tables have
been correctly programmed) and the DSP can be put in a state where it is
ready to receive measurement requests, then test step counter 204 is
initialized to zero and the actions specified in box 206 are performed. A
test can comprise of a number of steps. A step may require waiting for the
DSP to perform a measurement. At box 206, a timeout down counter is
started to provide a time limit on the amount of time that the measurement
engine will wait for the DSP to complete a requested measurement. If the
test record indexed by the test number contains a DSP measurement request,
the measurement request is sent to the DSP. If the measurement request was
sent to the DSP or the test record specifies only conversion routines,
then the measurement engine transitions along line 208 to the Foreground
Test In Process, No Error state 210. If the DSP could not be sent a
measurement request in 206 or if an I2C bus error occurred while accessing
the DSP or EEPROM, then line 216 is followed to the Power Quality Test
Done Error state.
The measurement engine remains at the Foreground Test In Process, No Error
state 210 until either the DSP measurement is completed or the timeout
down counter counts down to zero. If the DSP measurement completes without
error and the test record indexed by the test number points to another
test record, then at box 212 the conversion routine is performed and the
step counter is incremented. If the step counter exceeds a maximum number
of steps (preferably set to 127), then the test is assumed to be
incorrectly defined and the measurement engine will transition along line
214 to the Power Quality Test Done Error state. Otherwise, the test number
is replaced by the test number of the test record indexed by the present
value of the test number and the actions specified by box 206 are
repeated.
If the DSP measurement completes without error and the test record indexed
by the test number does not point to another test record, then the
Foreground Test In Process, No Error state 210 transitions at 226 to the
Test Done Requestor Timer Started state 228. During this transition, the
timeout count down timer is reset to a new value to set a limit on the
amount of time that the measurement engine will wait before automatically
returning to the Idle state 200.
If an error has been detected 224 at the Foreground Test in Process, No
Error state 210, then the measurement engine transitions to the Power
Quality Test Done Error state. During this transition, the timeout count
down timer is reset to a new value to set a limit on the amount of time
that the measurement engine will wait before automatically returning to
the Idle state 200.
If the measurement engine is at the Power Quality Test Done Error State and
the timeout down counter counts down to zero, then a Requestor Read Time
Out event 222 has occurred and the measurement engine transitions to the
Idle state 200.
If the measurement engine is at the Power Quality Test Done Error State
error status may be read as indicated by the Requestor Reads Error Status
event 221 and then the measurement engine will transition to the Idle
state 200.
If the measurement engine is at the Test Done, Requestor Timer Started
state and the timeout down counter counts down to zero, then a Time Out
Waiting For Requestor To Read Result 234 event has occurred and the
measurement engine will transition to the Idle state 200.
If the measurement engine is at the Test Done, Requestor Timer Started
state 228 and the measurement engine is asked for the measurement result
via the Requestor Reads Result event 230, then the conversion routine of
the last test record indexed will be performed and the result will be
returned to the requestor or if the conversion routine created an error
then a power tool error will be reported, as shown at box 232.
FIGS. 8A-8E are more detailed functional flow diagrams showing the steps
carried out by the measurement engine 50 in accordance with a preferred
embodiment of the invention. Referring to FIG. 8A, it can be seen that the
measurement engine 50 has two entry points: start background test 235 and
start test 236. The start background test 235 is used by the power quality
monitor engine 52 to send a measurement request to the measurement engine
50. The background test in process flag (element 124 in FIG. 6) provides
feedback to the power quality monitor engine 52 to indicate that the test
is still process. The start test 236 is used by the meter display and
communications functions to send foreground and communications priority
measurement requests to the measurement engine 50. Should the measurement
engine 50 receive a measurement request via the start test entry point
236, then the background test in process flag 124 will be cleared and the
measurement engine running at higher priority flag (element 125 in FIG. 6)
will be set at 237. When a measurement request has been completed and the
requester has read the instrumentation measurement, the measurement engine
running at higher priority flag 125 is desirably cleared. The power
quality monitor engine 52 will not issue a measurement request while the
measurement engine running at higher priority flag 125 is set. If the flag
125 is not set, the power quality monitor engine 52 will restart its power
quality monitor test if the background test in process flag 124 is
cleared.
In a preferred embodiment, the measurement engine 120 will perform all
actions specified up to the conversion routine specified by the last
measurement record in the linked list. The measurement engine 120 will
then set the measurement finished flag 123. When the measurement requester
111 observes that measurement finished is set, then the measurement engine
120 will be commanded to perform the last conversion routine and return
the final measurement to the measurement requester 111. Other embodiments
could complete all actions specified by the linked list before setting the
measurement finished flag 123 provided that the final measurement result
is left undisturbed until it has been read by the measurement requester
111.
A measurement record will preferably specify zero or one DSP conversion to
be performed, one conversion routine to perform, and either the next
record to be interpreted or an indicator that the end of the linked list
has been reached. The engine 120 will continue operation at the next
measurement record and so on until the "next measurement record" field
contains a code indicating the end of the linked list.
The measurement records define what the measurement engine 120 must do to
produce a requested measurement. Each measurement record is comprised of
24 bits. Bits 8 through 13 represent the pointer to the conversion
function associated with a measurement record. Depending on the purpose of
the conversion function, the measurement record fields may be interpreted
in different ways by the measurement engine 120. In the preferred
embodiment, the conversion functions cause the fields to be interpreted in
four different ways designated as types 1, 2, 3, and 4 as shown in Table
4.
TABLE 4
______________________________________
Record
type Measurement record bit field definitions
______________________________________
Bit # 23-22 21-20 19-16 15-14
______________________________________
type 1 chg ph pre conv func index pre xfer
type 2 chg ph iteration steps-1 pre xfer
type 3 phase dependent const index pre xfer
type 4 xx expanded function pre xfer
______________________________________
Bit # 13-18
7 6 5-0
______________________________________
type 1 conv function r0->dsp sav conv only next measurement
record index
type 2 iterate function r0->dsp sav conv only iterated measure-
ment record index
type 3 conv function r0->dsp sav conv only next measurement
with index record index
type 4 expand r0->dsp sav conv only next measurement
record index
______________________________________
Measurement Record Field Descriptions
In a preferred embodiment, the measurement record fields have the following
meaning. Other embodiments may utilize different field definitions, field
sizes, and record sizes.
next measurement record index
Pointer to the next measurement record in measurement table.
iterated measurement record index
Pointer to the first measurement record for an iterated measurement record
sequence. This measurement record sequence will be executed for the number
of specified iteration steps. After the last iteration then execution will
continue at iterated measurement record index +1.
chg-ph
Indicates that the phase to be measurement recorded should be modified
before the DSP conversion is started.
chg.sub.-- ph=00 for no change
01 for select phase A
10 for select phase B
11 for select phase C
function.sub.-- index
The index to the function record in the function table.
pre.sub.-- conv
Indicates actions to be taken after DSP conversion values have been scaled
but before the conversion routines run.
pre.sub.-- conv=00 for none
01 Clamp0--.sub. Low.sub.-- VA
10 Clamp1.sub.-- Low.sub.-- VA
11 for none (spare)
Const.sub.-- index
Used as an index to the constant table and service thresholds table.
Phase dependent
The constant index is phase dependent if the bit is set. In the preferred
embodiment, the phase dependent bit indicates to certain conversion
functions that alternative actions may be taken depending on which service
phase the DSP conversion was performed.
PreConversions
0 0 no transfers
0 1 dsp.sub.-- sav->r1
1 0 r1->dsp.sub.-- sav
1 1 dsp.sub.-- sav->r0, 0->dsp.sub.-- sav
Conversion Routines
The conversion routines are defined to operate on the data produced by DSP
measurements. Thirty-one routines were used to meet the exemplary
specifications for a preferred embodiment of the meter. These routines are
specified by the appropriate value in the func.sub.-- index field. The
actual purpose of each conversion routine is not important to the
understanding of the measurement engine except for the iterate routine.
Table 5 lists some exemplary routines executable the present invention.
TABLE 5
______________________________________
func.sub.-- index
Name
______________________________________
0 Read Dummy
1 Scale Data0
2 Data0 by Data1
3 Do RMS
4 Do RDS
5 Sum Square data0 data1
6 Expanded Function
7 Iservice Test
8 ArcCos
9 ArcTan
A Pack
B pfService Test
C LLArcCos
D LLArcTan
E Find Service
F Finish Service
10 Add Freq.sub.-- Const
11 Add Normal
12 Iterate
13 Mult Factor
14 Finish THD
15 Div Factor
16 Total Power
17 Scale r1
18 Pack Power
19 Clr r0 if r1 0
1A Set r0 if r1 It Nominal
1B Scale Up
1C Mod 360
1D Clamp0 Low VA
1E Clamp1 Low vAa
1F Total VAW
______________________________________
Expanded function index
Forty-nine additional routines, shown in Table 6, perform basic operations
on the power tool working registers. They are provided to support new
functions.
TABLE 6
______________________________________
expanded function code
Name
______________________________________
E HiLoRatio
F Set LL Do RmS
10 XOR Signs LL
11 xor Signs
12 Data0 by Data1 Set Signs LL
13 Data0 by Data1 Set LL
14 Set LL
15 Read Data
16 Add Factor
17 Get Freq Const
18 Smult
19 sqrt r0
1A Square data0 data1
1B mag r0
1C mag r1
1D Adjust Index
1E divide
1F Scaled Div
20 sqrt
21 Negate
22 Swapr0r1
23 r0 to dsp sav
24 dsp sav to r0
25 dsp sav to r1
26 dsp sav to temp1
27 f1 to r0
28 r0 to r1
29 r0 to temp1
2A r1 to r0
2B r1 to r3
2C r1 to f2
2D r1 to temp1
2E r1 to dsp sav
2F r3 to r1
30 r3 to r0
31 r3 to temp1
32 r3s to r0
33 r3s to r1
34 temp1 to r0
35 temp1 to r1
36 f2 to r1
37 sub r1 r0
38 sub r1 r3
39 sub r3s r0
3A add r3 to r0
3B add sav a r0
3C add sav b r1
3D add r3s to r0
3E add dsp sav to r0
3F Add r3 5 dsp sav
______________________________________
Definitions
Data0
The DSP is capable of producing two conversion results in parallel. Data0
represents the primary raw value read from the DSP. Data0 is preferably
multiplied by a conversion/calibration factor specific to the type of DSP
measurement performed to obtain a calibrated value.
Data1
Represents the secondary raw value read from the DSP. Data1 is preferably
multiplied by a conversion/calibration factor specific to the type of DSP
measurement performed to obtain a calibrate value.
R0,R1
General working registers. The register contents will both be preserved
across DSP measurements or while waiting for the display or communications
routines to read a measurement engine result.
DSP.sub.-- SAVE
Working register defined specifically for use by measurement engine
functions. The contents is preserved until cleared or overwritten by a
power quality measurement engine function.
Iterate routine
The effect of this routine is to provide power tools with a REPEAT . . .
UNTIL capability. The iteration step, and any steps that it may chain to,
will be performed and then the iterator will be decremented. This sequence
will continue until the iterator decrements from 0 to $FF. Operation will
then continue at the next step following the iteration step.
Phase.sub.-- Pointer, Phase.sub.-- to.sub.-- measure
The phase.sub.-- to.sub.-- measure and phase.sub.-- pointer contents encode
a phase designator, phase.sub.-- a, phase.sub.-- b, phase.sub.-- c,
end/begin, and a multiphase test flag. In general, if the multiphase test
flag is set, then the measurement engine will automatically advance the
phase designator in the phase.sub.-- pointer to the next phase (in
end/begin, A, B, C, end/begin order) supported by the service the meter is
connected to before interpreting the measurement record indicated by
measurement index. After the conversion routine has been executed, the
measurement engine will again automatically advance the phase designator
and interpret the measurement record. This advance and repeat sequence
continues until the last service phase has been converted and the
measurement engine advances the phase designator to the end/begin
designator. If the phase designator specified a phase that is not defined
for the present service that the meter is connected to, then the
measurement engine will not start and will return measurement
started=false to the measurement requestor.
In the preferred embodiment, measurement records are interpreted as shown
in FIGS. 8A-8E. Either entry point start background test 235 or start test
236 are suitable for starting the measurement engine. The difference
between the entry points is simply the implementation of the preferred
embodiment's priority method at 237. The ability to abort measurement
requests in process is accomplished by insuring that the iteration
capability is reset at 240 and the parameters measurement record number,
convert.sub.-- only and phase.sub.-- to.sub.-- measurement overwrite the
respective internal data storage areas measurement.sub.-- index, do.sub.--
convert.sub.-- only at 250 and phase.sub.-- pointer at 260. The entry
point queue test at 270 is used by the measurement engine to process
special instrumentation measurements such as the service.sub.-- voltage
and service.sub.-- current. Just after 240 and before the queue.sub.--
test entry point, the measurement engine tests the measurement record
number for reserved code indicating the service.sub.-- voltage check or
the service current check. These checks use additional processing to set
up or check necessary preconditions before the normal functions of the
measurement engine can be performed. If either type of check is found,
then the processing is performed which includes changing the measurement
record number to specify a measurement sequence the measurement engine is
capable of performing. Then control is returned to the measurement engine
at queue.sub.-- test. The measurement engine will be the requester and
call itself using entry point queue test at 270.
Once the parameters passed from the measurement engine have been saved,
processing continues as shown in FIG. 8B. If the save.sub.-- R0 flag was
received set at step 310, then the contents of working register R0 is
transferred to the save.sub.-- register at 320. The measurement record
fields to be interpreted is denoted MR in 330. MR is the measurement
record in the measurement table indexed by the measurement.sub.-- index.
If the do.sub.-- convert.sub.-- only flag is set at 340, then the
convert.sub.-- can.sub.-- run flag is set at 370, and the measurement
engine clears the measurement finished flag and returns measurement.sub.--
started=true at 3120. If do.sub.-- convert.sub.-- only was not set, then
the change overrides the phase.sub.-- pointer's phase designation. The
phase.sub.-- pointer will then be validated at step 360 to insure that the
phase designated is supported by the service and phase. Note that in cases
where the service has not been determined, the phases supported are
determined to be those phases that the meter has been configured to be
capable of measuring. If the phase designated was not supported by the
service or auto advancing the phase designator resulted in the end/begin
designation at 380, then the measurement engine returns measurement
started=false at 390 to the measurement requester. If the phase.sub.--
pointer is designating a valid phase, then the conversion function index
of the MR is tested at 3110 to determine if the MR is a type 2 (iterate)
record. If the MR is a type 2, then convert.sub.-- can.sub.-- run is set
at 370 and the measurement engine returns measurement.sub.-- started=true
to the measurement requester.
All other types of measurement records preferably utilize a DSP conversion
to be started prior to returning at 3100. Note that while it is possible
for a type 3 or type 4 measurement record to erroneously be processed at
step 3100 (erroneous because type 3 and type 4 do not specify a DSP
conversion), in practice this preferably will not occur provided the
requester has set the convert.sub.-- only flag. In the preferred
embodiment, the DSP conversion is started as shown in FIG. 8C. FR denotes
the function record, indexed by the func.sub.-- index field in the MR, of
the function table at 410. The FR in conjunction with the phase designator
is the phase.sub.-- pointer which represents a complete specification of
which DSP conversion to start, what phase to perform the conversion on,
how many line cycle pairs to perform the conversion for, what
initialization data should be provided to the DSP, and what scale factors
should be used to scale or calibrate the DSP conversion results to known
units of measure. This information is used at 420 to start the DSP
conversion. Once the conversion is started, the measurement.sub.--
finished flag 123 is cleared at 430 and the measurement engine returns
measurement.sub.-- started=true at 440.
It can be seen from the above discussion that when the measurement engine
returns to the measurement requester either no measurement was started, or
the measurement was started and the measurement finished flag is cleared,
and either the convert.sub.-- can.sub.-- run flag is set and the DSP was
not started, or the measurement was started and convert.sub.-- can.sub.--
run is not set and DSP conversion was started.
The measurement engine responds to the measurement requester as discussed
above to begin the instrumentation measurement. Once begun, the
measurement engine executes independently from the measurement requester,
as shown in FIG. 8D. Decision block 510 shows that the Do.sub.--
Measurement process is in an idle loop while measurement finished is true
or while the DSP is converting. If neither case is true, then the
phase.sub.-- pointer is tested at 560 to determine if this was the last
measurement to be performed to produce the instrumentation measurement. If
the end.sub.-- of.sub.-- chain designator is found then the
iteration.sub.-- step is tested at 5130 to determine if an iterate
instruction is in process. If not, then the measurement finished flag is
set to notify the measurement requester that the instrumentation
measurement is ready to be read. The measurement requester can read the
instrumentation measurement by calling the read conversion function shown
in FIG. 8E. After the measurement requester has obtained the result, the
requester clears the measurement engine running at higher priority flag.
If it is determined that an iteration instruction is in process at 5130
after finding the end.sub.-- of.sub.-- chain at 560, the conversion
function pointed to by the MR will be executed by the Run.sub.--
Conversion process in FIG. 8E. After the conversion function has
completed, the iterator value will be decremented. If that was the last
iteration, then the measurement.sub.-- index will be changed to the
contents of iteration.sub.-- step. If phase.sub.-- pointer indicates that
this is a multiphase measurement, then the phase.sub.-- pointer will be
reset to the end/begin designator so that after the auto advance occurs at
360, the next phase measurement will be phase A.
Processing continues at 530 to begin the next iteration. The continue test
is called at 550 to start the first measurement of the iterated sequence.
After the continue test returns either the measurement was not started or
it was started, either converted.sub.-- can.sub.-- run is true or false.
If the measurement was not started then the conversion routine for the MR
corresponding to the measurement.sub.-- index will not be executed.
Instead, processing will continue at 5130. If the measurement was started
and convert.sub.-- can.sub.-- run is false, then a DSP conversion was
started and the measurement engine must wait for the conversion to
complete at 5100. If convert.sub.-- can.sub.-- run is true, then a DSP
conversion was not started. The conversion routine of the MR is executed
by Run.sub.-- Conversion.sub.-- Function at 5110. After the conversion
function has completed, the next.sub.-- measurement.sub.-- index of the MR
is checked for the end.sub.-- of.sub.-- chain code. If the end.sub.--
of.sub.-- chain code is discovered, then processing begins again at 5130
as described above. Otherwise processing will continue at 5140.
At 5140, the next.sub.-- convert.sub.-- only flag of the MR is transferred
to the convert.sub.-- only flag and the next.sub.-- measurement.sub.--
index field of the MR is transferred to the measurement.sub.-- index to
select the next MR. Processing continues as 5170 as described above. At
560, if the next.sub.-- measurement.sub.-- index was not the end.sub.--
of.sub.-- chain code, then the conversion routine specified by the MR will
be executed by calling the Run.sub.-- Conversion process at 590. After the
conversion routine has been has been completed, then processing continues
at 5140 as described above.
At 520, if the phase.sub.-- pointer can be auto advanced to another phase
supported by the service, then the conversion routine specified by the MR
will be executed by a call to Run.sub.-- Conversion at 540. After the
conversion routine has been completed, the processing continues at 550 as
described above.
The Run.sub.-- Conversion routine flowchart is shown in FIG. 8E. The
preconversions field of the MR processed in 610 provide general purpose
register operations to all conversion functions. If the MR caused a DSP
conversion to be performed at 620, the DSP conversion results are read and
then scaled by the scale factors pointed to be the function record
selected from the function table according to the func.sub.-- index field
of the MR at 630. The pre.sub.-- conv function specified in the MR is then
performed on the scaled data at 640. Lastly, the conversion routine
specified by MR is called at 650 and then Run.sub.-- Conversion returns to
its caller. If at 620 it was determined that no DSP conversion had been
performed, the processing continues at 650 as described above.
In a preferred embodiment, at least fourteen different power quality tests
are programmed for concurrent operation. Referring back to FIG. 5, power
quality tests (also referred to as background tests) can make use of the
following resources: occurrence logs 86, event logs 78, active warnings
76, load control relays 84, and display warnings 88. There are preferably
the same number of occurrence logs 86 as power quality tests. An
occurrence log 86 consists of a logging flag, a binary occurrence counter,
and an occurrence timer. Background warning start and stop times can be
recorded in the event log 78 if the background test has an occurrence log
86 specified. The event codes are based on the occurrence log number
associated with the background test. Each background warning condition can
be programmed to assert the load control relay. The relay will deassert if
no function within the meter has requested an assertion. The use of these
power quality resources is explained in detail below.
FIGS. 9A and 9B show a context diagram showing the power quality test
engine processing utilizing internal flags in accordance with the present
invention. Power quality tests are checks of instrumentation values to
determine unusual conditions on the electrical service which might
indicate power quality, equipment failure, or tampering issues. These
conditions are qualified against a magnitude threshold for a minimum
duration. For example, voltage above 120% of the nominal voltage might
damage electrical equipment, but short term transitions to this level have
little effect and are relatively common. Thus, a magnitude and a minimum
duration is typically desired to qualify a condition as an abnormal
condition. These qualified tests are referred to as power quality events.
The magnitude thresholds can be minimum thresholds as well as maximum
thresholds. Thresholds can also define acceptable or abnormal bands of
operation. Because the meter can operate in a number of services and over
a number of voltages, the thresholds for many of the monitors are best
defined in terms of the service locked into the meter. Other tests need
thresholds which are absolute numbers. Both methods are supported in the
present invention. The duration can be defined in terms of seconds or
minutes. In accordance with the present invention, any number of
quantities can be monitored for abnormal conditions within practical
constraints imposed on the background processing and the desired time
frame for repeating the tests. These quantities can be defined to a
particular phase or can be treated generically for all meter phases.
The power quality tests are performed preferably one-at-a-time, in
sequence. Quantities are requested of and obtained from the meter IC 14
over the IIC serial bus 36 using the instrumentation (power quality
measurement) feature of the meter IC 14 when other higher priority
operations are not using this feature of the meter IC 14. The display and
communications routines have priority over the power quality monitors.
Because the power quality measurements vary in length and the other
routines have a higher priority than the power quality tests, time between
monitor samples is not consistent or predictable as is described in more
detail below.
When a power quality event is identified, a number of actions can be taken
by the meter. The meter can count the event and accumulate the duration of
the event. The meter can also set a warning which can appear on the
meter's display. The meter can also set a warning which is definable by
the utility, but only available through optical or remote communications.
The meter can also operate a relay. The meter can also record the start
and end time and date of the event in an event log. The exact action of
the meter is defined by the meter configuration.
The operation and interactions of the power quality monitor can be better
understood from the power quality monitor context diagram shown in FIGS.
9A and 9B, the state diagram in FIGS. 10A and 10B, and the associated flow
charts in FIGS. 11A-11I. Before the power quality tests are operational,
several conditions are preferably satisfied. If these are not met, the
meter continues to poll these conditions to determine when they have been
met. The BACKGROUND ENABLED FLAG turns on or off the power quality test
feature within the meter, and thus, this flag is set before the tests may
be carried out by the meter. As previously stated, the thresholds for many
of the power quality tests are defined in terms of the service locked into
the meter, thus, the SERVICE LOCKED FLAG is also preferably set. Also, if
power quality tests are enabled to run, the service is not locked, and
service checks are not permitted to run (disabled), then the meter has not
been configured correctly because the service cannot be locked-in. In this
condition, a warning should be set. In this invention this is the same
warning as is displayed for active power quality monitor events (POWER
QUALITY MONITOR WARNING FLAG). Other warnings are also within the scope of
the invention. Because the test mode is used when the meter is being
verified, service conditions may be abnormal while the various tests are
being run. Thus, in accordance with a preferred embodiment of the
invention, the power quality tests are disabled while in the test mode
(the METER IN TEST MODE FLAG is set). It should be understood however,
that the power quality tests may be enabled during test mode operation.
Thus in a preferred embodiment, if any of these flags are set, the power
quality tests do not run.
In addition, certain conditions can suspend power quality tests while
higher priority routines are serviced. Because the power quality tests
preferably use the same resources within meter IC 14 as the display or
communications routines, the power quality monitor is suspended while
measurements for these higher priority routines are performed (MEASUREMENT
ENGINE RUNNING AT HIGHER PRIORITY FLAG) and while previous measurements
are in-progress (BACKGROUND TEST IN PROCESS FLAG). If the measurement does
not successfully complete, an error flag is set (MEASUREMENT ERROR FLAG),
and the present invention advances to the next test. This is done so that
a measurement error caused by improper configuration or equipment failure
does not prevent other power quality monitors from running. When any
pending measurements have successfully completed (MEASUREMENT FINISHED
FLAG) and the conditions previously described have been met, the power
quality monitors are free to start a measurement sample.
Because the time between power quality measurements varies, an ELAPSED
SECONDS count and FREE RUNNING MINUTES TIMER is used to provide the time
base. The power quality test engine needs to know which test is the next
to execute. This is controlled by a pointer to the next record,
BKGND.sub.-- REC, known as BKGND.sub.-- INDEX. The monitor defines the
measurement to make (MEASUREMENT RECORD NUMBER) and the phase or phases to
measure (PHASE.sub.-- TO.sub.-- MEASURE). Thus the POWER QUALITY MONITOR
ENGINE knows the next measurement to perform. (The BKGND.sub.-- INDEX is
normally not 0.) The monitor engine 52 starts the test by setting the
BACKGROUND TEST IN PROCESS FLAG to true and clearing other flags that will
be used in the engine. The monitor can be run on a single phase specified
in the monitor record, on all valid phases performing the test on each
phase, or on all valid phases performing the test once on the combination
of the phases. The PHASE.sub.-- CODE in the record is examined and based
on its value is assigned to the variable PHASE.sub.-- TO.sub.-- MEASURE
and for a monitor which tests all valid phases individually, the
MULTIPHASE TEST variable is set to true. This information and the
MEASUREMENT RECORD NUMBER are provided to the POWER QUALITY MEASUREMENT
ENGINE to start the measurement. The POWER QUALITY MEASUREMENT ENGINE
provides information on the status of the measurement by setting the
MEASUREMENT ERROR FLAG. If the measurement did not start, the power
quality monitor engine 52 clears the BACKGROUND TEST IN PROCESS FLAG and
the MEASUREMENT ERROR FLAG, and advances to the next power quality
monitor.
Because the display warning code can be driven by multiple monitors, a
state is needed to check if no events are active. In the present
invention, the test index equal to 0 allows for this state. This state
could have occurred at other (or multiple) test index numbers. When the
test index equals 0, the power quality monitor engine assumes an event is
active (BACKGROUND WARNED FLAG set). The assigned background warning flags
are examined and if all of those which are intended to drive a display
warning (POWER QUALITY MONITOR WARNING FLAG) are clear, the BACKGROUND
WARNED FLAG is cleared. If the SERVICE CHECK ERROR FLAG is not set, the
POWER QUALITY MONITOR WARNINGS FLAG is cleared. Otherwise, the POWER
QUALITY MONITOR FLAG is set. The BKGND.sub.-- INDEX is now set to 1 and
the background warning flags are cleared and waiting to be set at the
detection of an event.
When the measurement is complete, the high and low thresholds may need to
be computed from the nominal identified in the monitor record. The
quantity is compared using the test defined within that power quality
monitor record against the raw or computed threshold by the POWER QUALITY
MONITOR ENGINE. If the threshold test indicates a possible event (fails
the test criteria), the event may need to be qualified against a minimum
duration and warnings and other event logging may need to occur. The
routine in this invention which determines when and what actions to take
is the LOG-FAULT routine. The LOG.sub.-- FAULT routine is passed the
OWNER.sub.-- CODE which defines if the high or low threshold was exceeded,
the LOG.sub.-- NUMBER which is the log number in the monitor record
corresponding to threshold exceeded, and the WARNING.sub.-- NUMBER which
is the warning code in the monitor record corresponding to the threshold
exceeded.
In the LOG.sub.-- FAULT routine, if the minimum duration (ALARM TIME) in
the monitor record is 0, the event does not need to be qualified against a
minimum duration and can be immediately logged. This is done by checking
the monitor record to determine if the POWER QUALITY MONITOR WARNING FLAG
should be set (this causes a warning to be displayed on the meter LCD),
and the BACKGROUND WARNING BIT assigned in the monitor record is set.
Based on the OWNER.sub.-- CODE, either the USING.sub.-- HIGH or
USING.sub.-- LOW variable is set to true. These variables are used to
identify the owner of the log. If the LOG.sub.-- NUMBER does not point to
a real occupance log, the LOG.sub.-- FAULT routine can do no more, and
thus, returns. If the LOG.sub.-- NUMBER points to an occurrence log
presently in use (LOGGING FLAG set), the routine need not do anything
else, and thus returns. If the LOG.sub.-- NUMBER points to an occurrence
log not presently in use, the routine increments the number of event
(OCCURRENCE LOG), and sets the LOGGING FLAG. If the RELAY REQUEST FLAG is
set in the monitor record, then the BKGND RELAY FLAG is set and it should
be noted that this log has set the relay flag (BK.sub.-- RELAY). This
assures that this log has set the relay flag (BK.sub.-- RELAY) and assures
that the BKGND.sub.-- RELAY gets cleared if all the logs which can set the
BKGND.sub.-- RELAY have ceased to have active events. If event logging
(time and date of occurrence in the event log) is enabled in the monitor
record, the start condition for this event is generated by adding hex `80`
to the log number and sending this event code to the event log routine.
If the minimum duration (ALARM TIME) in the monitor record is not 0, the
event needs to be qualified against a minimum duration. The units of the
minimum duration (TIMEBASE), minimum duration value (ALARM TIME VALUE),
and timer to use to time the minimum duration (ALARM TIMER) are also
defined in the power quality monitor record. In the present embodiment,
sixteen ALARM TIMERS are available from which to choose. Multiple monitors
can use the same timer. However, if the monitor record does not reference
a real alarm timer, this qualification cannot occur, and thus, the
warnings for the event are set as described above, and the routine
returns. If a real alarm timer is referenced, that timer is checked to see
if it is 0 (not running). If it is 0, the alarm timer is assigned to the
OWNER.sub.-- CODE. The monitor activating the ALARM TIMER is maintained
(OWNER CODE) so that the POWER QUALITY MONITOR ENGINE knows which minimum
duration time to compare the alarm timer's ELAPSED TIME against and which
monitor can terminate the timing of a condition. The timer is started
using the timebase defined in the monitor record. When a timer is started,
an ALARM TIMER STATUS is set indicating that the timer is in use. The
routine can then return. If the alarm timer is running (timer not equal to
zero), an event is presently being timed. If this event (OWNER.sub.--
CODE) is not the same event as presently timed, the routine returns.
Otherwise, based on the OWNER.sub.-- CODE, either the USING.sub.-- HIGH or
USING.sub.-- LOW variable is set to true. The alarm timer is tested. If
the timer is still timing (LOGGING FLAG True), then the routine returns.
If the timer is suspended, indicating that the timer was used to qualify
an event but no occurrence log is being used, then the warnings for the
event are set as described above and routine returns. If the timer has met
the minimum duration requirement (Timed Out), the warnings for the event
are set as described above and the LOG.sub.-- NUMBER is checked. If the
LOG.sub.-- NUMBER points to an occurrence log presently in use (LOGGING
FLAG set) then the alarm timer has timed out at least once before and was
reloaded to measure its largest possible time interval. In that case, the
routine adds the largest interval to the timer to record the elapsed
interval and then again restarts the alarm timer to measure its largest
interval and select the minute timer as the time base, and returns. If the
LOG.sub.-- NUMBER points to an occurrence log not presently in use, the
routine increments the number of events (OCCURRENCE LOG), and sets the
LOGGING FLAG. If the RELAY REQUEST FLAG is set in the monitor record, then
the BKGND RELAY FLAG is set. Note that this log has set the relay flag
(BK.sub.-- RELAY) which only gets cleared if all the logs which can set
the BKGND.sub.-- RELAY have be ceased to have active events. If event
logging (time and date of occurrence in the event log) is enabled in the
monitor record, the start condition for this event is generated by adding
hex `80` to the log number and sending this event code to the event log
routine. The routine then increments the occurrence timer by the alarm
time value specified in the monitor record minus the elapsed time in the
minute timer, restart the alarm timer to measure its largest interval and
select the minute timer as the time base, and returns. Thus, the timers
are appropriately started and any warnings have been flagged.
Once any faults are logged, the MULTIPHASE TEST flag is checked. If this is
a multiphase test, the PHASE.sub.-- TO.sub.-- MEASURE is advanced to the
next phase supported by the locked service. If this is not the last phase,
the above measurement is repeated on the new phase and the above operation
is repeated back to this point. If this was not a multiphase tests or it
was the last phase of the multiphase test, the status of the event is
checked by the check test status routine.
Since a single power quality monitor test definition can cause multiple
phases to be tested and possibly logged, the power quality monitor engine
does not attempt to change an occurrence log from logging to not logging
or clear an alarm timer until all phases specified by the power quality
monitor test have been tested. The check test status routine is
responsible for inspecting the test conditions and making the decision to
transition from logging and or timing an event into waiting for the next
event. This transitioning operation is referred to as closing the log. If
the power quality monitor test specifies the same occurrence logs for both
high and low events, then if either USING.sub.-- HIGH or USING.sub.-- LOW
is set, the occurrence log and alarm timer should be left in its present
state and Check Test Status returns. If both USING.sub.-- HIGH and
USING.sub.-- LOW are clear, then Clear.sub.-- Log is called with
parameters warning.sub.-- stop.sub.-- code set the occurrence log number.
Clear.sub.-- log performs the transition steps required to close the log
specified in log.sub.-- to.sub.-- close. If an alarm timer was used by the
test, it is cleared in preparation for timing the next occurrence of an
event. Check Test Status then returns. If Check Test Status determines
that different occurrence logs are specified for high and low events, then
conditions will be checked to see if each log can be closed. If
USING.sub.-- LOW is not set, then the low log can be closed. The
warning.sub.-- stop.sub.-- code will be set to low.sub.-- warning.sub.--
code and Clear.sub.-- Log will be called to insure the low log is closed.
After Clear.sub.-- Log returns or if USING.sub.-- LOW was true, then
USING.sub.-- HIGH is tested. If USING.sub.-- HIGH is set, then no further
action is required and Check Test Status returns. Otherwise, the
warning.sub.-- stop.sub.-- code will be set to the high.sub.--
warning.sub.-- code and Clear.sub.-- Log will be called to insure the high
log is closed. At this point, if USING.sub.-- LOW is clear, then neither
high nor low type events are being logged. If an alarm timer was used by
the test, it is cleared in preparation for timing the next occurrence of
an event. Check Test Status will then return. If USING.sub.-- LOW is set,
then the alarm timer must be left as is and Check Test Status will return.
As previously stated, Clear.sub.-- Log performs the transition steps
desired to close the log specified in log.sub.-- to.sub.-- close. The
background warning bit indexed by the passed warning code is cleared. If
the log.sub.-- to.sub.-- close does not point to a real occurrence log,
then no further action is required and Clear.sub.-- Log returns.
Otherwise, the occurrence log referenced by log.sub.-- to.sub.-- close is
closed by insuring that the logging flag is cleared. If an alarm timer was
in use by the power quality monitor test, then the elapsed time since the
alarm timer was last restarted and the elapsed seconds since the minute
timer last rolled over are added to the occurrence timer. If the relay
request flag is set for the power quality monitor test, then the relay
request flag corresponding to the log.sub.-- to.sub.-- close will be
cleared. If the relay request flags are determined to be cleared, then the
bkgnd relay flag will also be cleared to indicate that no power quality
monitor test requires the relay associated with background test to be
cleared. If event logging is enabled for the power quality monitor test,
then an event code of hex$C0+log.sub.-- to.sub.-- close is sent to the
event log to record the transition from log open to log closed. Finally,
Clear.sub.-- Log returns.
Thus, in summary, if the condition does not persist for the minimum
duration, the ALARM TIMER STATUS is cleared, and the event is not
qualified and is treated as if the condition never existed. If the
condition persists for the minimum duration, a new ALARM TIMER STATUS is
set and a number of meter operations can occur depending on the
configuration of the power quality monitor. If the monitor is configured
to have an event drive one of the 14 OCCURRENCE LOGs, the OCCURRENCE COUNT
is incremented in the appropriate OCCURRENCE LOG and the LOGGING STATUS is
set for that LOG. When the event terminates, the ALARM TIMER elapsed time
is added to the OCCURRENCE TIME and the logging status is cleared (NOT
LOGGING STATUS). If the monitor is configured to drive the EVENT LOG, the
start time and date of the event is recorded with the start EVENT CODE in
the EVENT LOG. When the event terminates, the end time and date of the
event is recorded with the end EVENT CODE in the EVENT LOG. (The EVENT
CODE is defined by the Power Quality Monitor number so that the actual
monitor causing the event is known, but other methods of assigning the
EVENT CODE's could be employed.) If the monitor is configured to drive a
specific warning (ASSIGNED BACKGROUND WARNING FLAGS), that defined warning
is set in the POWER QUALITY MONITOR WARNING FLAG for the duration of the
event. This warning is cleared when the event ends. If the monitor is
configured to drive the display warning for power quality monitor events
(BACKGROUND WARNING FLAG), this flag is set for the duration of the event.
This warning is cleared when all events end which are driving this
warning. If the monitor is configured to drive the load control relay, the
BKGND RELAY FLAG is set for the duration of the event. This flag is
cleared when the event terminates. The relay drive routine monitors this
flag and handles the actual driving of the relay. The power quality
monitors can configure any combination of these operations.
The meter may be programmed to increment event counters, totalize event
times, set warning indicators, latch relays, and log event start and stop
times when a measurement fails a test. The tests may be further qualified
by timers such that a measurement fails a test for a programmable amount
of time (e.g., 1 second to 60 minutes) before the programmed action
occurs. Such parameters are stored in the EEPROM 35 in the power quality
test table shown in FIG. 3. The power quality test table comprises a
preselected set of records. Each power quality test definition specifies
the electrical measurement to perform, the phase or phases to test, the
type of comparison to perform after the measurement, the value to compare
the measurement against, the amount of time that the test must fail before
an action is taken, and the action to take in the event that a measurement
exceeds a threshold. In a preferred embodiment the records comprise the
following field descriptions:
Field 1: Comparison test number--This field is a single index that
specifies which of several possible types of comparison tests to perform
on the value measured during a given background test and the threshold
values specified by the background record.
Field 2: Specifies actions to take if a test against a low threshold fails.
Field 3: Specifies actions to take if a test against a high threshold
fails.
Field 4: Initial alarm time value--Specifies the time that a warning
condition preferably should exist before a failure is declared. If the
value is zero then no time delay will be in effect and warning conditions
are consequently logged immediately upon detection.
Field 5: Timer number--Specifies the alarm timer to be used if the initial
alarm time value is non-zero.
Field 6: Low log number--Specifies which occurrence log to use to log low
warnings,
Field 7: High log number--Specifies which occurrence log to use to log high
warnings.
Field 8: This field provides the raw data used to compute a high threshold
value to test against a background measurement. The field is interpreted
as either an Embedded Normal value, an Embedded Percent value or a Percent
Above Nominal value depending on the value of the Nominal.sub.-- Code in
field 10.
Field 9: This field provides the raw data used to compute a low threshold
value to test against a background measurement. The field is interpreted
as either an Embedded Normal value, an Embedded Percent value or a Percent
below Nominal value depending on the value of the Nominal.sub.-- Code in
field 10.
Field 10: Specifies the Nominal.sub.-- Code and the Phase.sub.-- Code
designating either phase A, B or C which are described in more detail
below.
Field 11: DSP measurement record index--Specifies the measurement record
number needed for the background test to be performed. An index of 0
indicates the end of the background test list if fewer than maximum
background tests are defined. Setting any background test index causes
that background test and all following tests not be performed. The
background test sequence will start again at test 1.
Note that setting DSP.sub.-- Test.sub.-- Index=0 is one way to disable
background tests.
Referring back to FIG. 5, the power quality engine 52 performs the
designated comparison test after receiving the measurement 60 from the
measurement engine 50. The returned measurement is then tested in
accordance with the comparison tests specified by the power quality test
record utilizing service specific thresholds 70 which are referenced by
the power quality test records. The following lists a few exemplary power
quality tests and describes how these tests utilize service threshold
information.
PQ Test 1: Abnormal service voltage:--Defined by the Service Test (repeated
below)
Measured voltage phase angles outside a +/-15 degree nominal voltage angle
band; and
Measured voltages outside a +/-10% nominal phase voltage band.
Duration: Either condition or combination of conditions for greater than 60
seconds.
PQ Test 2: Abnormally low voltage
Measured voltage less than 6% of nominal service voltage on any phase.
Duration: Condition on any phase or combination of phases for greater than
60 seconds.
PQ Test 3: Abnormally high voltage
Measured voltage greater than 6% of nominal service voltage on any phase.
Duration: Condition on any phase or combination of phases for greater than
60 seconds.
PQ Test 4: Abnormal service current (power factor and reverse
power)--Defined by the Service Current Test (repeated below)
Leading or lagging measured power factor less than 0.25 on single phase and
wye services, and 0.00 on delta services,
Negative measured power (current) on any phase.
Duration: Either condition or combination of conditions for greater than 5
minutes.
PQ Test 5: Abnormally low service current--Defined by the Service Current
Test
Measured current less than 0.1% of class current on any phase, but not ALL
phases.
Duration: Condition on any phase or combination of phases for greater than
5 minutes.
PQ Test 6: Abnormal power factor
Measured Power factor less than 0.45 leading or lagging on any phase on
single phase and wye services, and 0.2 on delta services.
Duration: Condition on any phase or combination of phases for greater than
5 minutes.
PQ Test 7: Excess 2nd harmonic current
Measured 2nd harmonic current greater than 0.5 amperes on any phase.
Duration: Condition on any phase or combination of phases for greater than
15 minutes.
PQ Test 8: Excess total harmonic current distortion
Measured total harmonic distortion greater than 30% of fundamental on any
phase.
Duration: Condition on any phase or combination of phases for greater than
60 seconds.
PQ Test 9: Excess total harmonic voltage distortion
Measured total harmonic distortion greater than 30% of fundamental on any
phase.
Duration: Condition on any phase or combination of phases for greater than
60 seconds.
Based on the outcome of the specified power quality test, one or more power
quality resources 76, 78, 80, 82, 84, 86, 88 in FIG. 5 are acted on by the
power quality engine as is described in detail below. The individual power
quality monitor comparison tests specify how fields 6, 7, 8 and 9 are
used. In general, low log numbers indicate the log to use if a test
against a low threshold fails. Likewise, the high log numbers are used
when testing measurements against high thresholds. This implementation
allows a single measurement to be tested against one or more thresholds
but defining a single test. With a single log, the statistics about the
times the test failed are known. However, for multiple threshold tests,
information about which threshold was crossed more often or for longer
periods of time is preferably not delineated. The use of two logs supports
band type tests where a measurement may be desired to be either between
two thresholds or outside two thresholds. This allows outcome statistics
to be collected for each threshold.
Each power quality test is capable of selecting one value from the service
thresholds table shown in FIG. 3. The value selected is considered to be a
nominal value to be used to create test thresholds. High and low
thresholds are computed by scaling the nominal value up and down by the
high and low threshold percent values which are preferably labeled
Raw.sub.-- High.sub.-- Threshold and Raw.sub.-- Low Threshold in the power
quality test table. The service thresholds table has been implemented as
packed array of words or records. The array is indexed by the
Nominal.sub.-- Table.sub.-- Index. The Nominal.sub.-- Table.sub.-- Index
is stored in the Nominal.sub.-- Code.sub.-- sub-field of field 10.
As an example, consider a nominal code represented by a five-bit value. If
the five bits are considered to represent values from $00 to $1F then:
values in the range of $00 to $1C are considered to be word boundary
indices into the service thresholds table; the value $1D is used to
specify that the special six byte value bk.sub.-- factor should be used as
the nominal value; the value $1E is used to specify that the high and low
thresholds should be generated by treating the high and low threshold
percent values as packed word values for the high and low thresholds that
each represent the range of 0 to 100 percent; the value $1F is used to
specify that the high and low thresholds should be generated by treating
the high and low threshold percent values as packed word values for the
high and low thresholds that each represent the range of 0 to 1. In a
preferred, embodiment computes and stores the thresholds using forty-eight
bit arithmetic with sixteen bits of resolution to the right of the binary
point.
Field 10 also contains a three bit sub-field called Phase.sub.-- Code to
indicate the phases the power quality test shall test. The values of the
Phase.sub.-- Code field are defined as follows:
Phase.sub.-- Code=0..7
0=Test Phase A measurement
2=Test Phase B measurement
4=Test Phase C measurement
1=Measure all service phases and perform one test on the result
7=Test all service phases one at a time.
The power quality monitor engine is responsible for interpreting the
Phase.sub.-- Code field and constructing correct measurement requests to
the power quality measurement engine.
Referring back to FIGS. 10A and 10B, each power quality test will be in a
state that depends on whether or not an alarm timer is allocated to the
test, whether or not an occurrence log is allocated to the test, and on
the condition being monitored relative to programmable test limits.
If no alarm timer or occurrence log is assigned to a power quality test,
then the power quality test will either be in state s1 or s2. The power
quality test will be state s1 as long as the measurement defined for the
test passes the test. If a measurement defined for the test fails, then
the test the warning bit assigned to the power quality test will be set,
the power quality monitor warning flag will be set if programmably enabled
for the power quality test, and the power quality test will be in stated
s2. The power quality test will remain in state s2 until the measurement
defined for the test passes and the power quality test returns to state
s1. During the transition to state s1, the warning bit assigned to the
power quality test will be cleared.
If no alarm timer is assigned to a given power quality test but an
occurrence log is assigned, then the power quality test will either be in
state s3 or s4. The power quality test will be in state s3 as long as the
measurement defined for the test passes the test. While in state s3, if a
measurement defined for the test fails the test, then the warning bit
assigned to the power quality test will be set, the power quality monitor
warning flag will be set if programmably enabled for the power quality
test, the occurrence log logging flag will be set, the binary occurrence
log will be incremented, a relay request flag corresponding to the
occurrence log number will be set, if programmably enabled, to request the
load control relay be actuated, a power quality monitor start event code
corresponding to the occurrence log number will be sent to the event log
if programmably enabled, and the power quality test will be state s4. The
power quality test will remain in state s4 until the measurement defined
for the test passes and the power quality test returns to state s3. During
the transition from state s4 to s3, the warning bit assigned to the power
quality test will be cleared, the relay request flag corresponding to the
occurrence log number will be cleared, if programmably enabled, to
indicate that this power quality test does not require actuation of the
load control relay and the occurrence log logging flag will be cleared.
If an alarm timer is assigned to a given power quality test but an
occurrence log is not assigned, then the power quality test will either be
in state s5, s6 or s7. The power quality test will be in state s5 as long
as the measurement defined for the test passes the test. If a measurement
defined for the test fails the test, then the alarm timer assigned to the
power quality test will be programmed with the alarm time value defined
for the power quality test. The power quality test will transition to
state s6 and shall remain in this state until either the measurement
defined for the test passes or until the alarm timer times out. If the
measurement for the test passes then the alarm timer will be disabled and
the power quality test will return to state s5. If the alarm timer times
out while in state s6, then the warning bit assigned to the power quality
test will be set, the power quality monitor warning flag will be set if
programmably enabled for the power quality test, the alarm timer will be
disabled, and the power quality test will transition to state s7. The
power quality test will remain in state s7 until the measurement defined
for the test passes and the power quality test transitions to state s5.
During the transition from states s7 to s5, the warning bit assigned to
the power quality test will be cleared and the power quality monitor
warning flag will be cleared if programmably enabled for the power quality
test.
If an alarm timer and an occurrence log is assigned to a given power
quality test, then the power quality test will either be in state s8, s9
or s10. The power quality test will be in state s8 as long as the
measurement defined for the test passes the test. If a measurement defined
for the test fails the test, then the alarm timer assigned to the power
quality test will be programmed with the alarm time value defined for the
power quality test. The power quality test will transition to state s9 and
shall remain in this state until either the measurement defined for the
test passes or until the alarm timer times out. If the measurement for the
test passes, then the alarm timer will be disabled and the power quality
test will return to state s8. If the alarm timer times out while in state
s8, then the warning bit assigned to the power quality test will be set,
the power quality monitor warning flag will be set if programmably enabled
for the power quality test, the occurrence log logging flag will be set,
the binary occurrence log will be incremented, the relay request flag
corresponding to the occurrence log number will be set, if programmably
enabled, to request the load control relay be actuated, a power quality
monitor start event code corresponding to the occurrence log number will
be sent to the event log if programmably enabled, the alarm time value
will be added to the occurrence timer, the elapsed seconds of the free
running minute timer will be subtracted from the occurrence timer, the
alarm timer will be restarted to measure its maximum elapsed time (sixty
minutes in the preferred embodiment using the free running minute timer as
the alarm timer's time base), and the power quality test will transition
to state s10. The power quality test will remain in state s10 until the
measurement defined for the test passes or until the alarm timer times
out. If the alarm timer times out while the power quality test is in state
s10, then the maximum elapsed time that the alarm timer has measured will
be added to the occurrence timer and the alarm timer will be reloaded to
measure its maximum elapsed time. If the measurement passes the test while
the power quality test is in stated s10, then and the power quality test
transitions to state s8. During the transition from state s10 to s8, the
warning bit assigned to the power quality test will be cleared, the relay
request flag corresponding to the occurrence log number will be cleared,
if programmably enabled, to indicate that this power quality test does not
require actuation of the load control relay, the power quality monitor
warning flag will be cleared if programmably enabled for the power quality
test, the elapsed time since the alarm timer was reprogrammed will be
added to the occurrence timer.
The purpose of subtracting the elapsed seconds of the free running minute
timer from the occurrence timer during the transition to state s10 and
later adding the elapsed seconds of the free running minute timer to the
occurrence timer during the transition to state s8 is to enable the use of
a single free running minute timer as a time base to multiple alarm timers
running asynchronously with respect to each other while maintaining the
time measurement accuracy and resolution of the free running minute
timer's timebase.
C. Service Identification
FIG. 12 is a flow diagram showing the steps carried out by the
microcontroller 16 in accordance with the present invention to
automatically and electronically identify the service. At 1000, the DSP
outputs which drive the phase potential indicators (FIG. 2) are to check.
In a preferred embodiment, phases having an associated output with a high
signal level are determined to be powered.
Information representing the meter element configuration is preferably
stored in a predefined memory location in the EEPROM 35. In a preferred
embodiment, information indicating whether the meter must utilize all of
the elements is also stored in a memory location in the EEPROM 35. The
meter element configuration refers to how many and which phase voltages
and currents the meter is capable of measuring. At step 1002, the
microcontroller 16 checks the meter element configuration data stored in
the EEPROM 35 to determine whether the maximum meter elements must be used
or whether a lesser number of elements can be used. If the maximum meter
elements must be used, then at 1006 the microcontroller 16 determines
whether the correct phases are available, i.e., the phases present match
the phases identified by the meter element configuration data. If the
correct phases are not available, no service is determinable.
If the maximum number of elements is not required as determined at 1002,
then the microcontroller 16 checks for valid configurations such as single
phase on phase A, two-phase (present on phases A and C), and three-phase
services at 1004. Other configurations are preferably deemed invalid.
If no service is determinable or if the configuration is invalid, then at
1008 the unknown service code, e.g., "NONE", is stored in RAM in
connection with the service type status information which is referred to
herein as the service byte.
At step 1010, the microcontroller 16 determines whether the service is a
single phase, two-phase, or three-phase service. When the service is
two-phase service, the angle for Vca (the phase angle between phase C and
phase A) is measured. When the service is a three-phase service, phase
angles Vba (the phase angle between phase B voltage and phase A voltage)
and Vca are measured. In a preferred embodiment, the voltage phase angles
are measured using a DFT technique referenced to zero-crossing of Va.
As discussed above in connection with FIG. 3, a service angle table is
stored in the EEPROM 35. The service angle table, which is described in
detail below, generally includes records with a service byte and nominal
phase angles for phase C and B. The service byte is the first byte in the
service record and defines the services to which the entry applies. For
example, the service byte format may be represented as follows:
Bit 7: spare--not used.
Bit 6: cba--defines that cba rotation is a valid rotation.
Bit 5: abc--defines that abc rotation is a valid rotation.
Bit 4:4wd--4wd service; 1=4WD, 0=not 4WD.
Bit 3:4wy--4wy service; 1=4WY, 0=not 4WY.
Bit 2:3wy--3wy service; 1=3WY, 0=not 3WY.
Bit 1:3wd--3wd service; 1=3WD, 0=not 3WD.
Bit 0:1p--single phase service; 1=1P, 0=not 1P.
The nominal phase angles are preferably in 2-byte format represented in
binary in 0.01 degree increments. The microcontroller 16 at step 1016
searches the service phase table record-by-record for the first service
that includes the measured voltage angles. This process is described in
detail below. If a service phase angle record is found for the measured
phase angles at step 1020, the service byte is defined to identify the
phase rotation and service type corresponding to that record. Otherwise,
no known service is found, e.g., service byte="NONE", as shown at step
1008.
When the service byte has been defined, either because the service was
determined to be a single phase service at step 1010 or through the table
search technique described in connection with steps 1016 and 1020, the
service test continues at step 1018. At step 1018, each phase voltage that
is present is measured. Using these measurements, the microcontroller 16
searches the service voltage table 118 (described in connection with FIG.
3) at step 1022 for a record that includes the service type identified by
the service byte and each measured phase voltage. In a preferred
embodiment, the records in the service voltage table 118 may include a
service definition byte identifying possible services and scaling
information, information identifying the nominal service voltage,
information identifying the programmable potential indicator threshold to
be used with the service, and information identifying each of the maximum
and minimum tolerances with respect to the nominal service voltage.
Once the phase voltages are measured, the records are searched to determine
whether the measured voltages are within the defined tolerance range for
the phase and service type. If the voltages are valid, as determined at
step 1024, then the nominal voltage will be returned. The service voltage
record search must repetitively find a service voltage record that matches
the service designated by the service byte. The high and low tolerances
corresponding to the nominal voltage in the service voltage record are
preferably based on a minimum and maximum percent of the service voltage.
All voltages for the service preferably fall within the thresholds. Note
that some service types may require that phase A, B and C limits be
scaled. The voltage test procedure as well as the fields of the service
voltage table records is described in more detail below.
If a voltage test record is not identified at step 1024 as a matching
record, then the service byte is defined as "NONE" and the service nominal
voltage is set to zero at step 1008. If a voltage test record is
identified at step 1024, then the service byte and service voltage
identified by the matching record is returned and stored in RAM.
FIG. 13 is a detailed flow diagram showing an exemplary service phase table
search procedure in accordance with the present invention. This procedure
is best illustrated by reference to the Service Phase Table definition set
forth below:
##STR1##
The phase angle tolerances are preferably stored in EEPROM in advance as
indicated. The record definition includes a "service information byte"
which in the preferred embodiment includes the bit definition as indicated
above. Specifically, bit 7 is empty, bit 6 defines a cba phase rotation,
bit 5 defines an abc phase rotation, and bits 4-0 define different service
types. Each record in the service phase table includes a different service
information byte.
Referring back to FIG. 13, the first record in the service angle table is
checked at 1032 to determine whether the service information byte includes
an abc rotation bit. If so, the nominal phase angle range is then computed
at 1034 for phase C and phase B if those phase are present. The phase
angle computations are preferably carried out by adding the tolerance
specified for the appropriate phase to the phase angle specified in the
record to obtain the upper angle limit for the phase and subtracting the
tolerance from the phase angle specified to obtain the lower limit for the
phase. For example, referring to the Service Angle Table above, assume the
tolerance to be 25 deg. Considering the first listed record, to determine
the phase angle range to compare the measure phase angle for phase C, the
following computations are carried in hex:
upper limit=7530+05dc or in decimal 300 deg.+25 deg.
lower limit=7530+05dc or in decimal 300 deg.-25 deg.
If the measured phase angles are within the ranges computed as determined
at 1036, the first service bit=1 going from left to right in the service
information byte is identified as the service at 1038. For example,
considering the first record in the Service Angle Table above, the first
service bit in the service information byte corresponds to a 3-wire delta
type service. The service byte is then updated to define the 3-wire delta
service at step 1040. A pointer is then preferably stored to identify the
service angle record at step 1042.
If the measured phase angles were not determined to be within the computed
ranges at 1036, then the next record with an abc rotation bit in the
service information bit is located by carrying out steps 1044, 1046, and
1032. Therefore, each record with an abc rotation bit is checked for
matching phase angle measurements until either a match is found and the
service defined, or until no more records are available to check as
determined at step 1046. When no more records are available, the cba
rotation bit of the service information byte of each record is similarly
checked via steps 1044, 1050, 1048. If a record with a cba rotation bit
includes angle ranges that matches the measured ranges as determined at
step 1036, then the service bit is located at step 1038, the service
defined at step 1040, and a pointer set to the record at 1042. If no
record with a cba rotation bit matches the measured phase angles as
determined at 1036, then the service in the service byte is defined as
"NONE" at 1052.
FIG. 14 is a detailed flow diagram showing an exemplary service voltage
table search procedure in accordance with the present invention. This
procedure is best illustrated by reference to the Service Voltage Table
definition set forth below:
##STR2##
As indicated above, each record of the Service Voltage Table preferably
includes a 1-byte field referred to as the voltage service byte, a 2-byte
field representing the normal voltage for the service, a 2-byte field
representing the programmable potential indicator threshold to be used in
connection with the service, a 2-byte field representing a factor (>1) to
multiply the nominal voltage to arrive at the maximum threshold on the
nominal voltage range for the service, and a 2-byte field representing a
factor (<1) to multiply the nominal voltage to arrive at the minimum
threshold of the nominal voltage range for the service. The voltage
service byte preferably includes the following bit definition:
bits 7, 6, 5:
100=ab.5=scale A and B voltages by 0.5
010=c.5=scale C voltage by 0.5
001=c.866=scale C voltage by 0.866
011=2b=scale B voltage by 2
bits 4-0: Each bit represents a different electrical service.
Referring to FIG. 14, the search procedure begins after a service is
identified by the service angle search procedure. Each record of the
service voltage table is checked at 1060 to determine whether the voltage
service byte field includes a bit matching the same service identified in
the service byte, e.g., bit 1 in the voltage service byte and the service
byte=1 defining the 3-wire delta service. If a match is found at step
1060, the nominal voltage ranges designated by that record are computed at
1062. For example, the nominal voltage field data is multiplied by the
vmax percent field data (1+vmax percent) and then scaled according to bits
7, 6, and 5 of the voltage service byte to arrive at the upper threshold
for the nominal voltage range. Similarly, the nominal voltage field data
is multiplied by the vmin percent field data (1 vmin percent) and then
scaled according to the scaling information contained in the voltage
service byte to arrive at the lower threshold for the nominal voltage
range. As a specific example, consider the third listed record in the
Service Voltage Table set forth above. The nominal phase voltage is
designated in hex as "0960," the vmax percent is designated in hex as
"199A," and the voltage service byte service bits indicate that phases A
and B should be scaled by 0.5 and phase C should be scaled by 0.86. Thus
to arrive at the upper threshold, the following computation is carried
out:
0960 multiplied by (1+199A/FFFF)
Each measured phase voltage is then compared to the computed nominal
voltage range associated with the same phase at step 1064 to determine
whether or not the measured phase voltages "match," i.e., fall within the
nominal range. If the measured voltages match the nominal ranges, then the
service byte is defined as the current service definition at 1066 and a
pointer is set to the current service voltage record at step 1068. If the
measured voltages do not match the nominal voltage ranges then, the
procedure continues by checking whether or not more records are available
in the service voltage table at 1070. The same steps are carried out for
each record until either a valid service is found or until no more records
exist to check in the service voltage table. If no valid service is
identified and all of the records have been checked the service byte
returns "NONE" to indicate that no valid service was identified by the
service test at 1072.
As discussed above, the power quality tests require service-dependent
thresholds and other data. For this reason, it is important that the
correct service definition be locked into the meter. It should be
understood that power quality testing and flicker processing cannot be
enabled until a valid service is identified and locked.
FIG. 15 is a state diagram showing the states of the service locking
procedure according to the present invention. As shown in FIG. 15, there
are basically two states, locked and unlocked, each with a number of
conditional state definitions. These conditional definitions may include
whether or not the service test is enabled or disabled, whether or not
power quality testing is enabled or disabled, whether or not flicker
processing is enabled or disabled, whether or not a valid service has been
defined, and whether or not manual or autolock is defined. When any of
these conditional state definitions change, a transition to a different
state is triggered. The receipt of a lock or unlock command may also
result in a transition from one state to another.
At state 1100, shown in FIG. 15, the meter is in an unlocked state with
service check enabled, manual lock specified, both power quality testing
and flicker processing are disabled, and no valid service has yet been
identified. Upon detection of a valid service, the state 1100 transitions
to state 1104. As is described below, the valid service is preferably
displayed on the meter display. If the displayed service is the
anticipated or an acceptable service, the meter installer or technician
may depress the demand reset key to manual lock the service. If the demand
reset key is depressed, the state transitions from state 1104 to state
1102 and this locks the service.
A command to unlock the service is generated. If an unlock command is
received while in state 1102, the meter then transitions back to state
1100. The meter may also be reconfigured through programming changes to
provide the aforementioned autolock feature. If the meter is in state 1102
and is reconfigured to autolock the service, then the service is unlocked
and the meter transitions to state 1112. In this state, if a valid service
is defined by the service test, that service is automatically locked and
the meter transitions to state 1110. If no valid service is identified or
if an unlock command is received while in state 1110, then the meter
returns to state 1112.
The service test may be disabled through programming changes. If the
service test is disabled while the meter is in state 1102 or state 1110,
the meter transitions to state 1108. While in state 1108, the service is
locked and only the receipt of an unlock command will trigger a transition
to a different state. When an unlock command is received, the meter
transitions from state 1108 to state 1106. If the service is then locked
via reprogramming, the meter returns to state 1108.
FIG. 16 is a state diagram for an exemplary service test procedure and
display processing in accordance with the present invention. As discussed
above, various parameters and/or tests may be selected for display in the
normal or alternate display modes. Each selected item is measured, tested,
etc. and displayed for a predefined period of time. In a preferred
embodiment, the items are displayed one at a time in a fixed sequential
sequence. Therefore, each item selected for display in the normal mode is
sequentially processed and displayed while in the normal display
processing state 1200.
If a service test is specified as one of the selected items, a transition
to the service test processing state 1202 is made when the service test
becomes the current item in the display sequence. In a preferred
embodiment, the meter displays the message "SYS.sub.-- " on the LCD while
in the service test processing state. If a valid service is found and
autolocked, the service test procedure transitions to the locked display
state 1204 and a display timer is started. In a preferred embodiment, the
phase rotation, service voltage, locked status, and service type are
displayed for the predefined period of time. As shown in FIG. 16, the
phase rotation was "ABC", the service voltage was "120", the status "L"
indicates that the service was locked, and the service "1P" refers to
single phase. When the display timer indicates that the predefined display
period has elapsed, i.e., the display timer "times out", the display
procedure returns to normal display processing state 1200.
If a valid service is found but manual lock is required, the service test
procedure transitions to the display state 1210 and a display timer is
started. During the display state 1210, the service may is displayed and
may be manually locked by depressing the demand reset button. In a
preferred embodiment, the phase rotation, the service voltage, and the
service type are displayed on the meter display. If the demand reset
button is depressed, the service is locked, and the service test procedure
transitions to the locked display state 1204 with an "L" preferably
displayed in connection with the service definition. If the displayed
service is not locked while in display state 1210 before the display timer
times out, the service test procedure transitions to the service test
processing state 1214 until a valid service is identified and locked. Once
the valid service is locked, i.e., autolock is enabled, the service test
procedure transitions from the service test processing state 1214 to the
locked display state 1204 and restarts the display timer. If a valid
service is identified during the service test processing state 1214, but
requires manual locking, then the service test procedure transitions back
to the display state 1210.
If no valid service is found while in either service test processing state
1202, 1214, the display timer is started and the service test procedure
transitions to the error display state 1206. In a preferred embodiment,
the service error code "ser 555000" is displayed and locked on the meter.
If the alternate mode is invoked during the normal display sequence, for
example, by depressing the ALT button, the items designated for the
alternate display mode are processed and are displayed during the
alternate scroll processing states 1208, 1212. If the alternate scroll is
invoked after an invalid service determination is made or when the ALT
button is depressed before transitioning to the service test processing
state 1202, then the service test procedure reinvokes the service test
when the last alternate scroll item has been cleared from the display in
the alternate scroll processing state 1208. Similarly, if the alternate
mode is invoked during the display state 1210 or the service test
processing state 1214, the alternate scroll processing state 1212 is
entered and completed. At the end of the alternate scroll sequence, the
service test may be reinvoked if no prior valid service was identified.
However, if a valid service was identified prior to the alternate scroll
processing, then service may be locked and the display timer reset.
Another feature of the present invention is the provision of flicker
detection and indication capabilities. To this end, it will be recalled
that the meter IC 14 provides phase A, phase B, and phase C outputs. These
outputs are indicative of the presence of voltage on each of the
respective phases. Because meter 10 is intended for a wide range of uses,
i.e., capable of use over a wide range of voltages, the voltage levels on
phases A, B and C vary from use to use. Accordingly, one aspect of the
present invention is the provision of programmable threshold comparators
in the meter IC 14. Such comparators can be programmed with the threshold
appropriate for a given nominal service voltage. So long as the voltage
remains above the programmable threshold voltage, the signals output from
the DSP in the meter IC 14 will have a logic level indicating acceptable
voltage. Should voltage fall below the threshold level the output from DSP
changes, thereby providing an indication to microcontroller 16.
As shown in FIG. 17, the microcontroller 16 determines at every predefined
period (preferably defined as an executive clock pulse) the status of the
phase A, B and C outputs to determine the presence of a "glitch." A glitch
will be "announced" by the presence of a potential indicator (PI) Warning
at 1220. For every executive clock pulse, a determination is made if a
glitch is present. If a glitch indication is present, a further
determination is made to determine if the glitch indication is indeed a
glitch and not an actual power outage. To this end, a glitch counter is
provided which is incremented at 1224 for each consecutive executive clock
pulse during which a warning was also present. If the glitch counter is
above a glitch start value (a minimum number of counts necessary for a
legitimate glitch, stored at 1226 and determined at 1222) and less than a
glitch end value (a number of counts above which a glitch is in fact a
power outage, stored at 1228 and determined at 1222), the glitch counter
is increased by one, a log warning is generated, and a log duration is
generated. This operation can be duplicated for each phase.
Once a glitch has been determined, a warning and a warning flag are
produced at 1230 and 1232. These warnings are used to flash indicators 27,
29 and 31 on LCD 30 (FIG. 1), depending on whether a glitch is present on
phase A. B or C. Such warnings are also used to cause the voltages being
displayed on display 30 to flash ON and OFF.
Table 7 shows exemplary meter formulae for use with the present invention.
TABLE 7
Watt formulae
-3:Watts=K.sub.G (K.sub.A V.sub.A.sbsb.0 I.sub.A.sbsb.0 +K.sub.B
V.sub.B.sbsb.1 I.sub.B.sbsb.1 +K.sub.C V.sub.C.sbsb.2 I.sub.C.sbsb.2)
-2:Watts=K.sub.G ((K.sub.A V.sub.A.sbsb.0 -K.sub.B
V.sub.B.sbsb.0)I.sub.A.sbsb.0 +(K.sub.C V.sub.C.sbsb.2 -K.sub.D
V.sub.B.sbsb.2)I.sub.C.sbsb.2)
-8:Watts=K.sub.G (K.sub.A V.sub.A.sbsb.0 I.sub.A.sbsb.0 -(K.sub.B
V.sub.A.sbsb.1 I.sub.B.sbsb.1 +K.sub.B V.sub.C.sbsb.1
I.sub.B.sbsb.1)+K.sub.C V.sub.C.sbsb.2 I.sub.C.sbsb.2)
-7:Watts=K.sub.G (K.sub.A V.sub.A.sbsb.0 I.sub.A.sbsb.0 -K.sub.B
V.sub.A.sbsb.0 I.sub.B.sbsb.0 +K.sub.C V.sub.C.sbsb.2 I.sub.C.sbsb.2)
NOTE: Subscripts refer to the phase of the inputs. Subsubscripts refer to
the A/D cycle in which the sample is taken. Va for -7 applications is
actually line to neutral.
VA Formulae
-3:VA=K.sub.G [(K.sub.A V.sub.A.sbsb.0).sub.rms I.sub.A.sbsb.0.sub.rms
+(K.sub.B V.sub.B.sbsb.1).sub.rms I.sub.B.sbsb.1.sub.rms +(K.sub.C
V.sub.C.sbsb.2).sub.rms I.sub.C.sbsb.2.sub.rms ]
-2:VA=K.sub.G ((K.sub.A V.sub.A.sbsb.0 -K.sub.B V.sub.B.sbsb.0).sub.rms
I.sub.A.sbsb.0.sub.rms +(K.sub.C V.sub.C.sbsb.2 -K.sub.D
V.sub.B.sbsb.2).sub.rms I.sub.C.sbsb.2.sub.rms)
-8:VA=K.sub.G [K.sub.A V.sub.A.sbsb.0.sub.rms I.sub.A.sbsb.0.sub.rms
-K.sub.B (V.sub.A.sbsb.1 +V.sub.C.sbsb.1).sub.rms I.sub.B.sbsb.1.sub.rms
+K.sub.C V.sub.C.sbsb.2.sub.rms I.sub.C.sbsb.2.sub.rms ]
-7:VA=K.sub.G (K.sub.A V.sub.A.sbsb.0.sub.rms I.sub.A.sbsb.0.sub.rms
+K.sub.B V.sub.A.sbsb.0.sub.rms I.sub.B.sbsb.0.sub.rms +K.sub.C
V.sub.C.sbsb.2.sub.rms I.sub.C.sbsb.2.sub.rms)
RMS measurements are made over one line cycle and preferably begin at the
zero crossing of each voltage.
VAR Formula
VAR=.sqroot.VA.sub.A .sup.2 -Watt.sub.A .sup.2 +.sqroot.VA.sub.B .sup.2
-Watt.sub.B .sup.2 +.sqroot.VA.sub.C .sup.2 -Watt.sub.C .sup.2
where the subscripts are associated with the I terms of Watts and VAs and
the calculation is performed every cycle as shown below:
##EQU2##
For purposes of the above formulae, the following definitions apply:
-2 means a 2 element in 3 wire delta application;
-3 means a 3 element in 4 wire wye application;
-8 means a 21/2 element in 4 wire wye application;
-5 means a 2 element in 3 wire delta application; and
-7 is a 21/2 element in 4 wire delta application.
While the invention has been described and illustrated with reference to
specific embodiments, those skilled in the art will recognize that
modification and variations may be made without departing from the
principles of the invention as described hereinabove.