United States Patent |
5,537,331
|
Shinonaga
|
July 16, 1996
|
Method of testing devices to be measured and testing system therefor
Abstract
Disclosed is a method of sequentially conducting a series of tests on
devices to be measured starting with a first test up to an Nth test. The
method comprises the step of conducting the tests on the plurality of
devices to be measured concurrently in sequence starting with the first
test. During that time, determination as to whether each of the devices to
be measured is defective or non-defective is made each time the test is
completed. If it is determined that any of the devices to be measured is
defective after any of the series of tests is completed, that defective
device alone is replaced with a new device to be measured, and the series
of tests are restarted starting with a test subsequent to the test in
which the defective device is generated.
Inventors:
|
Shinonaga; Naoyuki (Itami, JP)
|
Assignee:
|
Mitsubishi Denki Kabushiki Kaisha (Tokyo, JP)
|
Appl. No.:
|
269524 |
Filed:
|
July 1, 1994 |
Foreign Application Priority Data
Current U.S. Class: |
716/4; 324/73.1 |
Intern'l Class: |
G01R 031/318.3 |
Field of Search: |
364/488,489,490,491,578
235/153
324/158,73 R,157,158 R,73.1
371/20,15
427/10
29/832
|
References Cited
U.S. Patent Documents
3873818 | Mar., 1975 | Barnard | 235/153.
|
4038599 | Jul., 1977 | Bove et al. | 324/158.
|
4348759 | Sep., 1982 | Schnurmann | 371/20.
|
4357703 | Nov., 1982 | Van Brunt | 371/15.
|
4441075 | Apr., 1984 | McMahon | 324/73.
|
4578279 | Mar., 1986 | Zingher | 427/10.
|
4727310 | Feb., 1988 | Hashimoto et al. | 324/157.
|
4761607 | Aug., 1988 | Shiragasawa et al. | 324/158.
|
5103557 | Apr., 1992 | Leedy | 29/832.
|
Other References
"Testing VLSI Chips with Weighted Random Patterns", by J. Waicukauski and
F. Motika, IEEE VLSI Technology, Systems and Applications Symposium, 1989,
pp. 149-154.
"High Precision Testing Method of Mixed Signal Device", by A. Watanabe et
al., IEEE Advanced Technologies in I & M, 1994, pp. 1284-1288.
|
Primary Examiner: Teska; Kevin J.
Assistant Examiner: Frejd; Russell W.
Attorney, Agent or Firm: Leydig, Voit & Mayer
Claims
What is claimed is:
1. A method of sequentially conducting a series of tests on a plurality of
devices to be measured starting with a first test up to an Nth test, said
method comprising the steps of:
conducting the series of tests on the plurality of devices to be measured
in sequence starting with the first test, including testing each one of
the plurality of devices simultaneously during each of the series of
tests;
determining whether each of the devices to be measured is defective or
non-defective each time one of the tests is completed;
interrupting the series of tests when a defective device is identified;
replacing the defective device with a new device to be measured, resuming
the series of tests starting with a test subsequent to the test in which
the defective device is identified.
2. A testing method according to claim 1 further comprising the step of
subjecting the plurality of devices to be measured including the newly
replaced device to an open short test before the series of tests are
resumed.
3. A testing method according to claim 1, wherein the series of tests
includes any of an output current test, an output voltage test, a power
source voltage leakage test, an input leakage test, a function test and an
open short test. devices to be measured is defective after any of said
series of tests is completed, said CPU storing a defective test item in
said defective test item storing portion corresponding to said device to
be measured, allowing said handler to replace said device to be measured
alone with a new device to be measured, and allowing said measuring
portion to restart said series of tests starting from the test subsequent
to said test.
4. A testing system for testing a plurality of devices, comprising:
a plurality of contactors
a measuring unit coupled to said plurality of contactors for testing the
plurality of devices to be measured simultaneously through said plurality
of contactors and for determining whether the devices to be measured are
defective or non-defective;
a program storing unit for storing programs corresponding to a series of
tests;
a plurality of defective test item storing portions corresponding with said
plurality of contactors for storing information regarding defective
devices;
a handler for conveying the devices to be measured and bringing the devices
into contact with corresponding contactors separately for each device; and
a CPU for controlling said measuring portion to conduct the series of tests
on said plurality of devices to be measured so that each device is tested
simultaneously during each of the series of tests on the basis of the
programs stored in said program storing unit and to interrupt the series
of tests when a defective device is identified by said measuring unit,
said CPU further storing a defective test item in a corresponding one of
said plurality of defective test item storing positions, said CPU further
controlling, said handler to replace the defective device with a new
device to be measured and said CPU further controlling said measuring
portion to restart the series of tests starting from a test subsequent to
the test in which the defective device is identified.
5. A testing system according to claim 4 wherein said measuring portion
conducts an open short test on said plurality of devices to be measured
including the new device to be measured before the series of tests is
restarted after a device which has been judged defective is replaced with
a new device to be measured.
Description
BACKGROUND OF THE INVENTION
1. Field of the Invention
The present invention relates to a method of testing devices to be
measured, and a testing system therefor.
2. Description of the Related Art
A conventional testing system of the above-described type is shown in FIG.
4. A handler 9 is connected to an LSI tester 1. The LSI tester 1 includes
a central processing unit (hereinafter referred to as a CPU) 2, a
measuring unit 3 for performing measurements on four devices to be
measured (hereinafter referred to as devices) 4a, 4b, 4c and 4d, and a
storage unit 5. The storage unit 5 includes a program storing portion 6
for storing programs of tests starting with a first test and ending with
an Nth test, and testable/non-testable information storing portions 13a,
13b, 13c and 13d for storing testable/non-testable information on the
devices 4a, 4b, 4c and 4d. The measuring unit 3 is connected to contactors
8a, 8b, 8c and 8d, which are to be electrically brought into contact with
the devices 4a, 4b, 4c and 4d.
The handler 9 is connected to the CPU 2 of the LSI tester 1 via a
communication data bus 12. The handler 9 includes a conveying portion 14,
and a control device 11 for performing control on the conveying portion
14. The conveying portion 14 is adapted to convey the devices 4a, 4b, 4c
and 4d from predetermined waiting positions to the contactors 8a, 8b, 8c
and 8d so as to allow the devices to be electrically brought into contact
with the corresponding contactors before the test is started. The
conveying portion 14 is also adapted to separate the devices 4a, 4b, 4c
and 4d from the contactors 8a, 8b, 8c and 8d after the test has been
completed. When the test is started, the conveying portion 14 of the
handler 9 is activated by the control device 11 to bring the devices 4a,
4b, 4c and 4d into contact with the contactors 8a, 8b, 8c and 8d,
respectively. Thereafter, the control device 11 transmits test start
instruction data to the CPU 2 of the LSI tester 1. Upon receipt of the
test start instruction data, the CPU 2 stores the testable data in the
testable/non-testable data storing portions 13a, 13b, 13c and 13d. At the
same time, the CPU 2 reads out the program of the first test from the
program storing portion 6 of the storing unit 5 and activates the
measuring unit 3 according to that program to perform the first test on
the four devices 4a, 4b, 4c and 4d in step S1 shown in FIG. 5.
When the first test is completed, the CPU 2 determines on the basis of the
results of the test whether the devices 4a, 4b, 4c and 4d are defective
products or non-defective products in step S2. If all the devices are
non-defective, the CPU 2 reads out the program of the second test from the
program storing portion 6 in step S3 to perform the second test.
Thereafter, the CPU 2 performs subsequent tests in a similar manner in
steps S4 through S7 until the Nth test is completed.
When the Nth test is completed in step S7, the CPU 2 transmits test
completion information data to the handler 9. The control device 11 of the
handler 9 drives the conveying portion 14 to discharge the devices 4a, 4b,
4c and 4d from the contactors 8a, 8b, 8c and 8d, whereby the first test
cycle is completed.
If it is determined in step S2 from the results of the first test that at
least one of the four devices 4a, 4b, 4c and 4d is defective, the CPU 2
determines in step S8 whether or not all the devices are defective. If
part of the devices are defective, the CPU 2 stores test suspension data
in the testable/non-testable data storing portion 13a, 13b, 13c or 13d
corresponding to the device the CPU 2 has judged defective in step S9, and
then executes the second test in step S3.
Before each test is conducted, the CPU 2 reads out the
testable/non-testable data corresponding to the respective devices from
the testable/non-testable data storing portions 13a, 13b, 13c and 13d. The
CPU 2 does not perform the test on the device in which the test suspension
data is stored as the testable/non-testable data. Accordingly, the second
test is not conducted on the device whose testable/non-testable data is
the test suspension data. If it is determined in step S8 that all the
devices are defective, the first test cycle is ended without the
subsequent tests from the second to the Nth tests being executed.
If it is determined that at least one of the devices is defective when each
test is completed, the CPU 2 similarly performs determination as to
whether all the devices are defective and storage of the
testable/non-testable data.
When the first test cycle is ended, the conveying portion 14 of the handler
9 brings four new devices to be tested into contact with the contactors
8a, 8b, 8c and 8d, and the control device 11 transmits the test start
instruction data to the CPU 2 of the LSI tester 1 so as to allow the
second test cycle to be started. The above-described operation continues
until a Pth test cycle is completed.
An example of the actual operation will now be described with reference to
the timing chart of FIG. 6. First, the devices 4a, 4b, 4c and 4d are
electrically brought into contact with the contactors 8a, 8b, 8c and 8d,
respectively, and then the first test cycle is executed on these four
devices starting with the first test. It is determined from the results of
the third test that the device 4b contacting the contactor 8b is
defective, and execution of the fourth and subsequent tests on the device
4b is suspended. The device 4b waits for the completion of the first test
cycle at the contactor 8b. Similarly, it is determined from the results of
the fourth test that the device 4d contacting the contactor 8d is
defective, and execution of the fifth and subsequent tests on the device
4d is suspended. The device 4d waits for the completion of the first test
cycle at the contactor 8d. Regarding the remaining the devices 4a and 4c,
since it is determined that they are non-defective, the test is conducted
thereon up to the last (Nth) test.
When the first test cycle is completed, the devices 4a, 4b, 4c and 4d are
discharged from the contactors, and new four devices 4e, 4f, 4g and 4h are
brought into contact with the contactors 8a, 8b, 8c and 8d. Thereafter,
the second test cycle is started. In the example shown in FIG. 6, it is
determined from the results of the fourth test that the device 4e is
defective. Thus, execution of the fifth and subsequent tests on the device
4e is suspended. The device 4e waits from the completion of the second
test cycle at the contactor 8a.
In recent years, there is a tendency that the number of functions and
capacity of a device are increased. This increases the number of testing
items and the time required for a single test item, thus increasing the
time required for the entire test. In a conventional testing system, when
it is determined during the test that the device is defective, that
defective device waits for the completion of that test cycle at the
corresponding contactor, thus reducing the processing ability of the
testing system and increasing the testing cost.
SUMMARY OF THE INVENTION
Accordingly, an object of the present invention is to provide a method of
testing devices to be measured which enables the processing ability of a
testing system to be improved.
Another object of the present invention is to provide a testing system
which enables the processing ability thereof to be improved.
In order to achieve the above objects, according to one aspect of the
present invention, there is provided a method of sequentially conducting a
series of tests on devices to be measured starting with a first test up to
an Nth test. The method comprises the step of sequentially conducting the
tests on the plurality of devices to be measured concurrently starting
with the first test. During that time, determination as to whether each of
the devices to be measured is defective or non-defective is made each time
the test is completed. If it is determined that any of the devices to be
measured is defective after any of the series of tests is completed, the
defective device alone is replaced with a new device to be measured, and
the series of tests are then restarted starting with a test subsequent to
the test in which the defective device is generated.
According to another aspect of the present invention, there is provided a
testing system which comprises a plurality of contactors with which a
plurality of devices to be measured are electrically brought into contact,
a measuring portion for testing the plurality of devices to be measured
together through the plurality of contactors and for determining whether
the devices to be measured are defective or non-defective, a program
storing portion for storing programs of series of tests starting with a
first test up to an Nth test, a plurality of defective test item storing
portions provided in correspondence with the plurality of contactors for
storing a test item with which the device to be measured which is brought
into contact with the corresponding contactor is judged defective, a
handler for conveying the devices to be measured and bringing the devices
into contact with the corresponding contactors separately for each device,
and a CPU for allowing the measuring portion to conduct the series of
tests concurrently on the plurality of devices to be measured which are
brought into contact with the plurality of contactors in sequence on the
basis of the programs stored in the program storing portion. When it is
determined by the measuring portion that any of the devices to be measured
is defective after any of the series of tests is completed, the CPU stores
a defecting test item in the defective test item storing portion
corresponding to the device to be measured, allows the handler to replace
the device to be measured alone with a new device to be measured, and
allows the measuring portion to restart the series of tests starting from
the test subsequent to the test.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a block diagram showing a testing system according to an
embodiment of the present invention;
FIG. 2 is a flowchart showing the operation of the embodiment;
FIG. 3 is a timing chart showing the operation of the embodiment;
FIG. 4 is a block diagram showing a conventional testing system;
FIG. 5 is a flowchart showing the operation of a conventional system; and
FIG. 6 is a timing chart showing the operation of the conventional system.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
An embodiment of the present invention will now be described below with
reference to the accompanying drawings.
In FIG. 1, the handler 90 is connected to the LSI tester 10. The LSI tester
10 includes a CPU 20, a measuring unit 30 for simultaneously performing
measurements on four devices to be measured 4a, 4b, 4c and 4d, and a
storage unit 50. The measuring unit 30 is connected to contactors 8a, 8b,
8c and 8d, which are to be electrically brought into contact with the
devices 4a, 4b, 4c and 4d. The storing unit 50 includes a program storing
portion 6 for storing the test programs of tests starting with a first
test and ending with an Nth test, and defective test item data storing
portions 7a, 7b, 7c and 7d for storing defective test item data on the
devices respectively contacted with the contactors 8a, 8b, 8c and 8d.
The handler 90 is connected to the CPU 20 of the LSI tester 10 via a
communication data bus 12. The handler 90 includes a conveying portion 24,
and a control device 21 for performing control on the conveying portion
24. The conveying portion 24 is adapted to convey the devices 4a, 4b, 4c
and 4d from predetermined waiting positions to the contactors 8a, 8b, 8c
and 8d so as to allow the devices to be electrically brought into contact
with the corresponding contactors before the test is started. The
conveying portion 14 is also adapted to separate the devices 4a, 4b, 4c
and 4d from the contactors 8a, 8b, 8c and 8d after the test has been
completed. The conveying portion 24 can asynchronously perform a series of
these operations separately on the devices.
The operation of this embodiment will now be described with reference to
the flowchart of FIG. 2. The programs of the tests starting with the first
test and ending with the Nth test and the testing program for executing a
series of operations shown in FIG. 2 are stored beforehand in the program
storing portion 6 of the storing unit 50. Further, "the Nth test" is
stored in each of the defective test item storing portions 7a, 7b, 7c and
7d of the storing unit 50 as the defective test item data.
When the test is started, the conveying portion 24 of the handler 90 is
activated by the control device 21 to bring the devices 4a, 4b, 4c and 4d
into contact with the contactors 8a, 8b, 8c and 8d, respectively.
Thereafter, the control device 21 transmits test start instruction data to
the CPU 20 of the LSI tester 10. Upon receipt of the test start
instruction data, the CPU 20 reads out the program for the first test from
the program storing portion 6 of the storing unit 50 and activates the
measuring unit 30 according to that program to perform the first test on
the four devices 4a, 4b, 4c and 4d in step S11 shown in FIG. 2.
When the first test is completed, the CPU 20 reads out in step S12 the
defective test item data stored in the defective test item storing
portions 7a, 7b, 7c and 7d of the storing unit 50, and determines whether
or not there is any defective test item data which coincides with the
completed test item, i.e., the first test, in this case. As mentioned
above, since "the Nth test" is stored in the defective test item storing
portions 7a, 7b, 7c and 7d beforehand, there is no defective test item
data which coincides with the completed test item.
Next, the CPU 20 determines on the basis of the results of the test whether
the devices 4a, 4b, 4c and 4d are defective in step S13. If all the
devices are non-defective, the CPU 20 reads out the program of the second
test from the program storing portion 6 in step S14 and performs the
second test. Thereafter, the CPU 20 performs subsequent tests in a similar
manner in steps S15 through S19 until the Nth test is completed.
If it is determined from the results of the test that at least one of the
devices 4a, 4b, 4c and 4d is defective in step S13, the CPU 20 suspends
execution of the test temporarily, and stores data "the first test" in the
defective test item storing portion corresponding to that defective device
in step S20. Thereafter, in step S21, the CPU 20 transmits both the test
completion information data and the data on the contactor contacting the
device which has been judged defective to the control device 21 of the
handler 90. In step S21, the control device 21 drives the conveying
portion 24 to remove the defective device contacting that contactor and
bring a new device to be tested into contact with that contactor.
Thereafter, the control device 21 transmits the test start instruction
data to the CPU 20.
Upon receipt of the test start instruction data, the CPU 20 reads out the
program for the second test from the program storing portion 6 of the
storing unit 50, and executes the second test in step S14. Thus, when a
defective device is generated, that defective device is replaced with a
new device to be tested at that time. The replaced device is tested
starting with the subsequent test. A series of tests on the newly
contacted device are conducted on the basis of the data stored in the
corresponding defective test item storing portion. For example, if a
defective device is generated in the third test, data "the third test" is
stored in the corresponding defective test item storing portion. The newly
replaced device is tested starting with the fourth test, and the final
test thereof is the third test represented by the data stored in the
corresponding defective test item storing portion.
When the second test is completed in step S14, the CPU 20 reads out the
defective test item data stored in the defective test item storing
portions 7a, 7b, 7c and 7d in step S15, and determines whether there is
any defective test item data which coincides with the second test. If
there is the defective test item data which coincides with the second
test, the CPU 20 determines that a series of tests have been completed on
that device, and removes that device from the contactor and brings a new
device to the contactor in step S22.
In this way, a series of tests are executed.
Now, an example of the actual operation will be described with reference to
the timing chart shown in FIG. 3. First, the devices 4a, 4b, 4c and 4d are
electrically brought into contact with the contactors 8a, 8b, 8c and 8d,
respectively, and then the first test cycle is executed on these four
devices starting with the first test. It is to be noted that data "the Nth
test" is stored beforehand in the defective test item storing portions 7a,
7b, 7c and 7d.
It is determined from the results of the third test that the device 4b
contacting the contactor 8b is defective. At that time, data "the third
test" is stored in the defective test item storing portion 7b of the
storing unit 50, the defective device 4b is removed from the contactor 8b,
and new device 4e is brought into contact with the contactor 8b. In that
state, the subsequent fourth test is started. It is determined from the
results of the fourth test that the device 4d contacting the contactor 8d
is defective. At that time, data "the fourth test" is stored in the
defective test item storing portion 7d corresponding to the device 4d, and
a new device 4f is brought into contact with the contactor 8d. In that
state, the subsequent fifth test is started.
Thereafter, the four devices 4a, 4c, 4e and 4f are tested until the Nth
test is completed without being judged defective. Since data "the Nth
test" has been stored beforehand in the defective test item storing
portions 7a and 7c corresponding to the devices 4a and 4c, the CPU 20
determines that a series of tests have been completed on the devices 4a
and 4c, and removes the devices 4a and 4c from the contactors 8a and 8c
and brings new devices 4g and 4h into contact with the contactors 8a and
8c. Since a series of tests have not yet been completed on the devices 4b
and 4d contacting the contactors 8b and 8d, they remain at the contactors
8b and 8d, and the test is continued.
The test is executed again starting with the first test. When the third
test is completed, since data "the third test" is stored in the defective
test item storing portion 7b, the CPU 20 determines that a series of tests
have been completed on the device 4e contacting the contactor 8b, and
removes the device 4e from the contactor 8b and brings new device 4i into
contact with the contactor 8b. Similarly, since a series of tests have
been completed on the device 4f contacting the contactor 8d when the
fourth test is completed, the device 4f is removed and new device 4k is
brought into contact with the contactor 8d.
Further, in the example shown in FIG. 3, it is determined from the results
of the fourth test that the device 4g contacting the contactor 8a is
defective. As a result, data "the fourth test" is stored in the defective
test item storing portion 7d corresponding to that device 4g, and a new
device 4j is brought into contact with the contactor 8a. In that state,
the subsequent fifth test is started.
Thus, when it is determined that the device is defective, that device is
replaced with new one at once. Consequently, the defective device does not
remain in the contactor for a long period of time, and the efficiency of
the test is thus improved.
Examples of the tests are the output current test, the output voltage test,
the power source voltage leakage test, the input leakage test, the
function test, the open short test and so on. The open short test is
conducted to investigate the protective diode characteristics in the
device, an electrical contact failure between the device and the contactor
and so on, and is characterized by a high failure generation rate.
Hence, if the open short test is executed first on the device which is
brought into contact with the contactor in place of the device on which a
series of tests have been completed or a defective device, the efficiency
of the test is further improved, thus further improving the processing
ability.
In the above-described embodiments, measurements were conducted
concurrently on the four devices. However, the number of devices to be
measured at one time is not limited to four; for example, up to 64 devices
may be measured simultaneously.